Predicting maximum scour depth around bridge abutment using M5 model
Scour around piers and abutments leads to a lot of bridge failures. Scouring around the bridge piers and abutments is one of the most important factors in bridge failure which happens over time and increases during floods, probably causing general damage to the bridge. Accordingly, the accurate esti...
Main Authors: | Javad Zahiri, Seyed Mahmood Kashefipour |
---|---|
Format: | Article |
Language: | fas |
Published: |
Shahid Chamran University of Ahvaz
2018-04-01
|
Series: | علوم و مهندسی آبیاری |
Subjects: | |
Online Access: | http://jise.scu.ac.ir/article_13543_70e5b7b9c44915ca2db43dae1deb59b6.pdf |
Similar Items
-
The Effect of Installing Immerse Vanes on Scouring Around Bridge Abutments
by: Atefe Heydari, et al.
Published: (2019-06-01) -
Interaction of Bridge Pier and Abutment on Local Scour Around Them
by: Morteza Arab, et al.
Published: (2016-04-01) -
Simultaneous Effect of Collar and Roughness on Reducing and Controlling the Local Scour around Bridge Abutment
by: Hamed Shahsavari, et al.
Published: (2017-01-01) -
Length Parameter for Scaling Abutment Scour Depth
by: Puer Xu, et al.
Published: (2020-12-01) -
Submerged vane-attached to the abutment as scour countermeasure
by: Mahmood Shafai Bejestan, et al.
Published: (2015-09-01)