The Erratic Implementation of Measuring, Monitoring and Control System (MMCS) in Chile: The crisis on smart meters
The implementation of the Measuring, Monitoring and Control System (MMCS) in Chile was the key element of the most important regulatory and political crisis which has affected the Chilean electric sector. In the news this period was named as “smart-meters crisis”. This crisis was also one of the ele...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2020-11-01
|
Series: | Energy Reports |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2352484720312543 |