Control panel and indicators for production control in building projects
In general, every project should have indicators that monitor compliance with established goals. In construction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2018-02-01
|
Series: | Organization, Technology and Management in Construction: An International Journal |
Subjects: | |
Online Access: | https://doi.org/10.1515/otmcj-2016-0027 |
id |
doaj-1cac2ce48ff94b2e878a0988b880208f |
---|---|
record_format |
Article |
spelling |
doaj-1cac2ce48ff94b2e878a0988b880208f2021-09-05T20:51:28ZengSciendoOrganization, Technology and Management in Construction: An International Journal1847-62282018-02-011011665167310.1515/otmcj-2016-0027otmcj-2016-0027Control panel and indicators for production control in building projectsOrihuela Pablo0Pacheco Santiago1Orihuela Jorge2Pontifica Universidad Católica del Perú Lima, PerúMotiva S.A., Lima, PeruMotiva S.A., Lima, PeruIn general, every project should have indicators that monitor compliance with established goals. In construction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper submitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230), presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.https://doi.org/10.1515/otmcj-2016-0027benchmarkingcontinuous improvementlagging indicatorsleading indicatorskey performance indicators |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Orihuela Pablo Pacheco Santiago Orihuela Jorge |
spellingShingle |
Orihuela Pablo Pacheco Santiago Orihuela Jorge Control panel and indicators for production control in building projects Organization, Technology and Management in Construction: An International Journal benchmarking continuous improvement lagging indicators leading indicators key performance indicators |
author_facet |
Orihuela Pablo Pacheco Santiago Orihuela Jorge |
author_sort |
Orihuela Pablo |
title |
Control panel and indicators for production control in building projects |
title_short |
Control panel and indicators for production control in building projects |
title_full |
Control panel and indicators for production control in building projects |
title_fullStr |
Control panel and indicators for production control in building projects |
title_full_unstemmed |
Control panel and indicators for production control in building projects |
title_sort |
control panel and indicators for production control in building projects |
publisher |
Sciendo |
series |
Organization, Technology and Management in Construction: An International Journal |
issn |
1847-6228 |
publishDate |
2018-02-01 |
description |
In general, every project should have indicators that monitor compliance with established goals. In construction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper submitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230), presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner. |
topic |
benchmarking continuous improvement lagging indicators leading indicators key performance indicators |
url |
https://doi.org/10.1515/otmcj-2016-0027 |
work_keys_str_mv |
AT orihuelapablo controlpanelandindicatorsforproductioncontrolinbuildingprojects AT pachecosantiago controlpanelandindicatorsforproductioncontrolinbuildingprojects AT orihuelajorge controlpanelandindicatorsforproductioncontrolinbuildingprojects |
_version_ |
1717783726517125120 |