Analysis and Prediction of Pavement Settlement Caused by Jacking Construction of Ultra-Shallow Rectangular Shield Frame Bridge

The primary purpose of this paper is to analyze and predict the ground settlement law of large-span rectangular shield frame bridge jacking project, to provide a reference for the optimization design and safe construction of similar projects. In this paper, combined with the jacking project of ultra...

Full description

Bibliographic Details
Main Authors: Da Hu, Yongsuo Li, Xiaoqiang Liang, Youping Wu, Sheng Zhang, Qi Yao
Format: Article
Language:English
Published: Hindawi Limited 2020-01-01
Series:Mathematical Problems in Engineering
Online Access:http://dx.doi.org/10.1155/2020/9624927
id doaj-1af830ecc85a49e080f06b9001551605
record_format Article
spelling doaj-1af830ecc85a49e080f06b90015516052020-11-25T04:07:56ZengHindawi LimitedMathematical Problems in Engineering1563-51472020-01-01202010.1155/2020/96249279624927Analysis and Prediction of Pavement Settlement Caused by Jacking Construction of Ultra-Shallow Rectangular Shield Frame BridgeDa Hu0Yongsuo Li1Xiaoqiang Liang2Youping Wu3Sheng Zhang4Qi Yao5School of Civil EngineeringSchool of Civil EngineeringSchool of Civil EngineeringPowerChian Zhongnan Engineering Co. Ltd.School of Civil EngineeringSchool of Civil EngineeringThe primary purpose of this paper is to analyze and predict the ground settlement law of large-span rectangular shield frame bridge jacking project, to provide a reference for the optimization design and safe construction of similar projects. In this paper, combined with the jacking project of ultra-shallow buried soft soil layer rectangular shield frame bridge, through the on-site monitoring, the settlement deformation law of the longitudinal and transverse sections of the expressway pavement during the jacking construction process is discussed, and the reasons for the large settlement and rebound are analyzed. The basic laws of the road surface settlement with time are summarized. Based on the Kriging spatiotemporal prediction model, the road surface settlement is predicted. The research shows that the transverse settlement trough of the pavement caused by the rectangular shield frame bridge’s jacking construction is stable within 15 m–20 m on both sides toward the axis and symmetrical along the coordinate axis and the alignment roughly conforms to the normal distribution. The influence range of settlement trough becomes greater and greater with shield jacking, and the final settlement curve is W-shaped. After comparing the predicted curve with the measured road settlement curve, we found that the two curves are in good agreement, and the prediction result of the Kriging spatiotemporal prediction model is valid, which can reflect the process of road deformation development during the jacking process of the shield.http://dx.doi.org/10.1155/2020/9624927
collection DOAJ
language English
format Article
sources DOAJ
author Da Hu
Yongsuo Li
Xiaoqiang Liang
Youping Wu
Sheng Zhang
Qi Yao
spellingShingle Da Hu
Yongsuo Li
Xiaoqiang Liang
Youping Wu
Sheng Zhang
Qi Yao
Analysis and Prediction of Pavement Settlement Caused by Jacking Construction of Ultra-Shallow Rectangular Shield Frame Bridge
Mathematical Problems in Engineering
author_facet Da Hu
Yongsuo Li
Xiaoqiang Liang
Youping Wu
Sheng Zhang
Qi Yao
author_sort Da Hu
title Analysis and Prediction of Pavement Settlement Caused by Jacking Construction of Ultra-Shallow Rectangular Shield Frame Bridge
title_short Analysis and Prediction of Pavement Settlement Caused by Jacking Construction of Ultra-Shallow Rectangular Shield Frame Bridge
title_full Analysis and Prediction of Pavement Settlement Caused by Jacking Construction of Ultra-Shallow Rectangular Shield Frame Bridge
title_fullStr Analysis and Prediction of Pavement Settlement Caused by Jacking Construction of Ultra-Shallow Rectangular Shield Frame Bridge
title_full_unstemmed Analysis and Prediction of Pavement Settlement Caused by Jacking Construction of Ultra-Shallow Rectangular Shield Frame Bridge
title_sort analysis and prediction of pavement settlement caused by jacking construction of ultra-shallow rectangular shield frame bridge
publisher Hindawi Limited
series Mathematical Problems in Engineering
issn 1563-5147
publishDate 2020-01-01
description The primary purpose of this paper is to analyze and predict the ground settlement law of large-span rectangular shield frame bridge jacking project, to provide a reference for the optimization design and safe construction of similar projects. In this paper, combined with the jacking project of ultra-shallow buried soft soil layer rectangular shield frame bridge, through the on-site monitoring, the settlement deformation law of the longitudinal and transverse sections of the expressway pavement during the jacking construction process is discussed, and the reasons for the large settlement and rebound are analyzed. The basic laws of the road surface settlement with time are summarized. Based on the Kriging spatiotemporal prediction model, the road surface settlement is predicted. The research shows that the transverse settlement trough of the pavement caused by the rectangular shield frame bridge’s jacking construction is stable within 15 m–20 m on both sides toward the axis and symmetrical along the coordinate axis and the alignment roughly conforms to the normal distribution. The influence range of settlement trough becomes greater and greater with shield jacking, and the final settlement curve is W-shaped. After comparing the predicted curve with the measured road settlement curve, we found that the two curves are in good agreement, and the prediction result of the Kriging spatiotemporal prediction model is valid, which can reflect the process of road deformation development during the jacking process of the shield.
url http://dx.doi.org/10.1155/2020/9624927
work_keys_str_mv AT dahu analysisandpredictionofpavementsettlementcausedbyjackingconstructionofultrashallowrectangularshieldframebridge
AT yongsuoli analysisandpredictionofpavementsettlementcausedbyjackingconstructionofultrashallowrectangularshieldframebridge
AT xiaoqiangliang analysisandpredictionofpavementsettlementcausedbyjackingconstructionofultrashallowrectangularshieldframebridge
AT youpingwu analysisandpredictionofpavementsettlementcausedbyjackingconstructionofultrashallowrectangularshieldframebridge
AT shengzhang analysisandpredictionofpavementsettlementcausedbyjackingconstructionofultrashallowrectangularshieldframebridge
AT qiyao analysisandpredictionofpavementsettlementcausedbyjackingconstructionofultrashallowrectangularshieldframebridge
_version_ 1715044872716550144