Analysis and Prediction of Pavement Settlement Caused by Jacking Construction of Ultra-Shallow Rectangular Shield Frame Bridge

The primary purpose of this paper is to analyze and predict the ground settlement law of large-span rectangular shield frame bridge jacking project, to provide a reference for the optimization design and safe construction of similar projects. In this paper, combined with the jacking project of ultra...

Full description

Bibliographic Details
Main Authors: Da Hu, Yongsuo Li, Xiaoqiang Liang, Youping Wu, Sheng Zhang, Qi Yao
Format: Article
Language:English
Published: Hindawi Limited 2020-01-01
Series:Mathematical Problems in Engineering
Online Access:http://dx.doi.org/10.1155/2020/9624927