Thirty Years of the Yellow River Water Allocation Scheme and future Prospect

Yellow River is an important source of water for northwest and north China, and an important strategic guarantee for the sustainable economic and social development of the Yellow River basin and its related regions. The Yellow River water allocation scheme (Scheme 1987 in short) was approved in 1987...

Full description

Bibliographic Details
Main Authors: wang Yu, Peng Shaoming, Jiang Guiqin, Fang Hongbin
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201824601083
id doaj-1acc4a106da049da998e98b01cadd6a5
record_format Article
spelling doaj-1acc4a106da049da998e98b01cadd6a52021-02-02T02:27:21ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-012460108310.1051/matecconf/201824601083matecconf_iswso2018_01083Thirty Years of the Yellow River Water Allocation Scheme and future Prospectwang Yu0Peng Shaoming1Jiang Guiqin2Fang Hongbin3Yellow River Engineering Consulting Co., Ltd.Yellow River Engineering Consulting Co., Ltd.Yellow River Engineering Consulting Co., Ltd.Yellow River Engineering Consulting Co., Ltd.Yellow River is an important source of water for northwest and north China, and an important strategic guarantee for the sustainable economic and social development of the Yellow River basin and its related regions. The Yellow River water allocation scheme (Scheme 1987 in short) was approved in 1987 by the State Council, which was the first river water allocation scheme in China. It allocates a total volume of 58 billion m3 of water to the 11 provinces along the river and its ecosystem. However, with the deepening impact of climate change and human activities, the Yellow River water resource and its development situations have some changes and the water resource of the drainage basin faces new situations, so it is urgent to carry out the optimization and adjustment study of Scheme 1987 under the new situation. The background and promulgation process of Scheme 1987 was reviewed comprehensively, and its implementation effect for 30 years was analyzed from two periods before and after unified dispatching. The new situation of the development of the Yellow River basin in the future was analyzed, and the work to be carried out to optimize and adjust the Scheme 1987 was prospected.https://doi.org/10.1051/matecconf/201824601083
collection DOAJ
language English
format Article
sources DOAJ
author wang Yu
Peng Shaoming
Jiang Guiqin
Fang Hongbin
spellingShingle wang Yu
Peng Shaoming
Jiang Guiqin
Fang Hongbin
Thirty Years of the Yellow River Water Allocation Scheme and future Prospect
MATEC Web of Conferences
author_facet wang Yu
Peng Shaoming
Jiang Guiqin
Fang Hongbin
author_sort wang Yu
title Thirty Years of the Yellow River Water Allocation Scheme and future Prospect
title_short Thirty Years of the Yellow River Water Allocation Scheme and future Prospect
title_full Thirty Years of the Yellow River Water Allocation Scheme and future Prospect
title_fullStr Thirty Years of the Yellow River Water Allocation Scheme and future Prospect
title_full_unstemmed Thirty Years of the Yellow River Water Allocation Scheme and future Prospect
title_sort thirty years of the yellow river water allocation scheme and future prospect
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2018-01-01
description Yellow River is an important source of water for northwest and north China, and an important strategic guarantee for the sustainable economic and social development of the Yellow River basin and its related regions. The Yellow River water allocation scheme (Scheme 1987 in short) was approved in 1987 by the State Council, which was the first river water allocation scheme in China. It allocates a total volume of 58 billion m3 of water to the 11 provinces along the river and its ecosystem. However, with the deepening impact of climate change and human activities, the Yellow River water resource and its development situations have some changes and the water resource of the drainage basin faces new situations, so it is urgent to carry out the optimization and adjustment study of Scheme 1987 under the new situation. The background and promulgation process of Scheme 1987 was reviewed comprehensively, and its implementation effect for 30 years was analyzed from two periods before and after unified dispatching. The new situation of the development of the Yellow River basin in the future was analyzed, and the work to be carried out to optimize and adjust the Scheme 1987 was prospected.
url https://doi.org/10.1051/matecconf/201824601083
work_keys_str_mv AT wangyu thirtyyearsoftheyellowriverwaterallocationschemeandfutureprospect
AT pengshaoming thirtyyearsoftheyellowriverwaterallocationschemeandfutureprospect
AT jiangguiqin thirtyyearsoftheyellowriverwaterallocationschemeandfutureprospect
AT fanghongbin thirtyyearsoftheyellowriverwaterallocationschemeandfutureprospect
_version_ 1724309816010080256