Thirty Years of the Yellow River Water Allocation Scheme and future Prospect
Yellow River is an important source of water for northwest and north China, and an important strategic guarantee for the sustainable economic and social development of the Yellow River basin and its related regions. The Yellow River water allocation scheme (Scheme 1987 in short) was approved in 1987...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201824601083 |
id |
doaj-1acc4a106da049da998e98b01cadd6a5 |
---|---|
record_format |
Article |
spelling |
doaj-1acc4a106da049da998e98b01cadd6a52021-02-02T02:27:21ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-012460108310.1051/matecconf/201824601083matecconf_iswso2018_01083Thirty Years of the Yellow River Water Allocation Scheme and future Prospectwang Yu0Peng Shaoming1Jiang Guiqin2Fang Hongbin3Yellow River Engineering Consulting Co., Ltd.Yellow River Engineering Consulting Co., Ltd.Yellow River Engineering Consulting Co., Ltd.Yellow River Engineering Consulting Co., Ltd.Yellow River is an important source of water for northwest and north China, and an important strategic guarantee for the sustainable economic and social development of the Yellow River basin and its related regions. The Yellow River water allocation scheme (Scheme 1987 in short) was approved in 1987 by the State Council, which was the first river water allocation scheme in China. It allocates a total volume of 58 billion m3 of water to the 11 provinces along the river and its ecosystem. However, with the deepening impact of climate change and human activities, the Yellow River water resource and its development situations have some changes and the water resource of the drainage basin faces new situations, so it is urgent to carry out the optimization and adjustment study of Scheme 1987 under the new situation. The background and promulgation process of Scheme 1987 was reviewed comprehensively, and its implementation effect for 30 years was analyzed from two periods before and after unified dispatching. The new situation of the development of the Yellow River basin in the future was analyzed, and the work to be carried out to optimize and adjust the Scheme 1987 was prospected.https://doi.org/10.1051/matecconf/201824601083 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
wang Yu Peng Shaoming Jiang Guiqin Fang Hongbin |
spellingShingle |
wang Yu Peng Shaoming Jiang Guiqin Fang Hongbin Thirty Years of the Yellow River Water Allocation Scheme and future Prospect MATEC Web of Conferences |
author_facet |
wang Yu Peng Shaoming Jiang Guiqin Fang Hongbin |
author_sort |
wang Yu |
title |
Thirty Years of the Yellow River Water Allocation Scheme and future Prospect |
title_short |
Thirty Years of the Yellow River Water Allocation Scheme and future Prospect |
title_full |
Thirty Years of the Yellow River Water Allocation Scheme and future Prospect |
title_fullStr |
Thirty Years of the Yellow River Water Allocation Scheme and future Prospect |
title_full_unstemmed |
Thirty Years of the Yellow River Water Allocation Scheme and future Prospect |
title_sort |
thirty years of the yellow river water allocation scheme and future prospect |
publisher |
EDP Sciences |
series |
MATEC Web of Conferences |
issn |
2261-236X |
publishDate |
2018-01-01 |
description |
Yellow River is an important source of water for northwest and north China, and an important strategic guarantee for the sustainable economic and social development of the Yellow River basin and its related regions. The Yellow River water allocation scheme (Scheme 1987 in short) was approved in 1987 by the State Council, which was the first river water allocation scheme in China. It allocates a total volume of 58 billion m3 of water to the 11 provinces along the river and its ecosystem. However, with the deepening impact of climate change and human activities, the Yellow River water resource and its development situations have some changes and the water resource of the drainage basin faces new situations, so it is urgent to carry out the optimization and adjustment study of Scheme 1987 under the new situation. The background and promulgation process of Scheme 1987 was reviewed comprehensively, and its implementation effect for 30 years was analyzed from two periods before and after unified dispatching. The new situation of the development of the Yellow River basin in the future was analyzed, and the work to be carried out to optimize and adjust the Scheme 1987 was prospected. |
url |
https://doi.org/10.1051/matecconf/201824601083 |
work_keys_str_mv |
AT wangyu thirtyyearsoftheyellowriverwaterallocationschemeandfutureprospect AT pengshaoming thirtyyearsoftheyellowriverwaterallocationschemeandfutureprospect AT jiangguiqin thirtyyearsoftheyellowriverwaterallocationschemeandfutureprospect AT fanghongbin thirtyyearsoftheyellowriverwaterallocationschemeandfutureprospect |
_version_ |
1724309816010080256 |