Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks

In railroad construction—in particular, direct-fixation tracks—a longitudinal concrete block known as a “plinth” is used to elevate the profiles of the railroad track from the aerial guideway (e.g., bridge deck). A post-construction alignment revision is often...

Full description

Bibliographic Details
Main Authors: Eungcheol Kim, Myungseob (Edward) Kim, Gabrielle Delos, Tyler Clark
Format: Article
Language:English
Published: MDPI AG 2019-11-01
Series:Sustainability
Subjects:
Online Access:https://www.mdpi.com/2071-1050/11/21/6166
id doaj-1a1c8c3358fe459fa9b5d5ef94ec6cb9
record_format Article
spelling doaj-1a1c8c3358fe459fa9b5d5ef94ec6cb92020-11-25T01:46:29ZengMDPI AGSustainability2071-10502019-11-011121616610.3390/su11216166su11216166Post-Construction Alignment Revision in Direct-Fixation Railroad TracksEungcheol Kim0Myungseob (Edward) Kim1Gabrielle Delos2Tyler Clark3Incheon National University, Yeonsu-gu, Incheon 22012, KoreaWestern New England University, Springfield, MA 01095, USAWestern New England University, Springfield, MA 01095, USAWestern New England University, Springfield, MA 01095, USAIn railroad construction—in particular, direct-fixation tracks—a longitudinal concrete block known as a “plinth” is used to elevate the profiles of the railroad track from the aerial guideway (e.g., bridge deck). A post-construction alignment revision is often required if the plinth elevation surpasses its maximum tolerance after the concrete pour. In such cases, the plinth surface needs to be grinded to meet the design elevation, or a shim should be inserted underneath the rail pad to raise the profile elevation. Considering both sides of the rail plinths, vertical design factors, and performance specifications, re-optimization of the vertical profile is of great interest, but the process poses challenges and represents a practical research problem. An optimization model aimed at minimizing the cost of post-construction alignment repairs is proposed and a real-case numerical example is analyzed to check the effectiveness of the model.https://www.mdpi.com/2071-1050/11/21/6166railroadsoptimizationalignmentdesignrepairpost-construction
collection DOAJ
language English
format Article
sources DOAJ
author Eungcheol Kim
Myungseob (Edward) Kim
Gabrielle Delos
Tyler Clark
spellingShingle Eungcheol Kim
Myungseob (Edward) Kim
Gabrielle Delos
Tyler Clark
Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks
Sustainability
railroads
optimization
alignment
design
repair
post-construction
author_facet Eungcheol Kim
Myungseob (Edward) Kim
Gabrielle Delos
Tyler Clark
author_sort Eungcheol Kim
title Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks
title_short Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks
title_full Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks
title_fullStr Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks
title_full_unstemmed Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks
title_sort post-construction alignment revision in direct-fixation railroad tracks
publisher MDPI AG
series Sustainability
issn 2071-1050
publishDate 2019-11-01
description In railroad construction—in particular, direct-fixation tracks—a longitudinal concrete block known as a “plinth” is used to elevate the profiles of the railroad track from the aerial guideway (e.g., bridge deck). A post-construction alignment revision is often required if the plinth elevation surpasses its maximum tolerance after the concrete pour. In such cases, the plinth surface needs to be grinded to meet the design elevation, or a shim should be inserted underneath the rail pad to raise the profile elevation. Considering both sides of the rail plinths, vertical design factors, and performance specifications, re-optimization of the vertical profile is of great interest, but the process poses challenges and represents a practical research problem. An optimization model aimed at minimizing the cost of post-construction alignment repairs is proposed and a real-case numerical example is analyzed to check the effectiveness of the model.
topic railroads
optimization
alignment
design
repair
post-construction
url https://www.mdpi.com/2071-1050/11/21/6166
work_keys_str_mv AT eungcheolkim postconstructionalignmentrevisionindirectfixationrailroadtracks
AT myungseobedwardkim postconstructionalignmentrevisionindirectfixationrailroadtracks
AT gabrielledelos postconstructionalignmentrevisionindirectfixationrailroadtracks
AT tylerclark postconstructionalignmentrevisionindirectfixationrailroadtracks
_version_ 1725019177313370112