Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks
In railroad construction—in particular, direct-fixation tracks—a longitudinal concrete block known as a “plinth” is used to elevate the profiles of the railroad track from the aerial guideway (e.g., bridge deck). A post-construction alignment revision is often...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2019-11-01
|
Series: | Sustainability |
Subjects: | |
Online Access: | https://www.mdpi.com/2071-1050/11/21/6166 |
id |
doaj-1a1c8c3358fe459fa9b5d5ef94ec6cb9 |
---|---|
record_format |
Article |
spelling |
doaj-1a1c8c3358fe459fa9b5d5ef94ec6cb92020-11-25T01:46:29ZengMDPI AGSustainability2071-10502019-11-011121616610.3390/su11216166su11216166Post-Construction Alignment Revision in Direct-Fixation Railroad TracksEungcheol Kim0Myungseob (Edward) Kim1Gabrielle Delos2Tyler Clark3Incheon National University, Yeonsu-gu, Incheon 22012, KoreaWestern New England University, Springfield, MA 01095, USAWestern New England University, Springfield, MA 01095, USAWestern New England University, Springfield, MA 01095, USAIn railroad construction—in particular, direct-fixation tracks—a longitudinal concrete block known as a “plinth” is used to elevate the profiles of the railroad track from the aerial guideway (e.g., bridge deck). A post-construction alignment revision is often required if the plinth elevation surpasses its maximum tolerance after the concrete pour. In such cases, the plinth surface needs to be grinded to meet the design elevation, or a shim should be inserted underneath the rail pad to raise the profile elevation. Considering both sides of the rail plinths, vertical design factors, and performance specifications, re-optimization of the vertical profile is of great interest, but the process poses challenges and represents a practical research problem. An optimization model aimed at minimizing the cost of post-construction alignment repairs is proposed and a real-case numerical example is analyzed to check the effectiveness of the model.https://www.mdpi.com/2071-1050/11/21/6166railroadsoptimizationalignmentdesignrepairpost-construction |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Eungcheol Kim Myungseob (Edward) Kim Gabrielle Delos Tyler Clark |
spellingShingle |
Eungcheol Kim Myungseob (Edward) Kim Gabrielle Delos Tyler Clark Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks Sustainability railroads optimization alignment design repair post-construction |
author_facet |
Eungcheol Kim Myungseob (Edward) Kim Gabrielle Delos Tyler Clark |
author_sort |
Eungcheol Kim |
title |
Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks |
title_short |
Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks |
title_full |
Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks |
title_fullStr |
Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks |
title_full_unstemmed |
Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks |
title_sort |
post-construction alignment revision in direct-fixation railroad tracks |
publisher |
MDPI AG |
series |
Sustainability |
issn |
2071-1050 |
publishDate |
2019-11-01 |
description |
In railroad construction—in particular, direct-fixation tracks—a longitudinal concrete block known as a “plinth” is used to elevate the profiles of the railroad track from the aerial guideway (e.g., bridge deck). A post-construction alignment revision is often required if the plinth elevation surpasses its maximum tolerance after the concrete pour. In such cases, the plinth surface needs to be grinded to meet the design elevation, or a shim should be inserted underneath the rail pad to raise the profile elevation. Considering both sides of the rail plinths, vertical design factors, and performance specifications, re-optimization of the vertical profile is of great interest, but the process poses challenges and represents a practical research problem. An optimization model aimed at minimizing the cost of post-construction alignment repairs is proposed and a real-case numerical example is analyzed to check the effectiveness of the model. |
topic |
railroads optimization alignment design repair post-construction |
url |
https://www.mdpi.com/2071-1050/11/21/6166 |
work_keys_str_mv |
AT eungcheolkim postconstructionalignmentrevisionindirectfixationrailroadtracks AT myungseobedwardkim postconstructionalignmentrevisionindirectfixationrailroadtracks AT gabrielledelos postconstructionalignmentrevisionindirectfixationrailroadtracks AT tylerclark postconstructionalignmentrevisionindirectfixationrailroadtracks |
_version_ |
1725019177313370112 |