Overload Control Strategy Based on Triangular Fuzzy Analytic Hierarchy Process
After the high-voltage transmission line is cut off due to a fault, the bearing transmission power will be transferred, which may cause overload. If overload cannot be eliminated quickly and scientifically, it is very likely that the line backup protection will be activated, which will trigger chain...
Main Author: | Wang Heng |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/32/e3sconf_posei2021_02019.pdf |
Similar Items
-
Summary of the Port Shoreline Resource Evaluation Based on Triangular Fuzzy Analytic Hierarchy Process
by: Jiang Liupeng, et al.
Published: (2017-11-01) -
The Study of Analytic Hierarchy Process and Fuzzy Analytic Hierarchy Process with Applications
by: CHEN, YI-WEN, et al.
Published: (2017) -
An Integrated Approach of Analytic Hierarchy Process and Triangular Fuzzy Sets for Analyzing the Park-and-Ride Facility Location Problem
by: Jairo Ortega, et al.
Published: (2020-07-01) -
On Consistency of Fuzzy Analytic Hierarchy Process
by: Yueh-Hsiang Chen, et al.
Published: (2008) -
Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process
by: Aida Azizi, et al.
Published: (2014-05-01)