Summary: | After the high-voltage transmission line is cut off due to a fault, the bearing transmission power will be transferred, which may cause overload. If overload cannot be eliminated quickly and scientifically, it is very likely that the line backup protection will be activated, which will trigger chain trip or even blackout accidents. In view of this, this paper proposed a cross-voltage level optimization load shedding control strategy based on fuzzy analytic hierarchy process. Through step-by-step progression in the three indexes of line overload degree, load importance degree, and unit load shedding cost, the lower-level lines of the overload line are selected for optimal line removal, thus achieving the goal of optimizing load shedding across voltage levels.
|