Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands

Common power system restoration planning strategy is based on a ‘build up’ approach, where a blackout system is sectionalized among several islands for parallel restoration prior to resynchronization. In order to speed up the resynchronization of the islands, each island must hav...

Full description

Bibliographic Details
Main Authors: Dian Najihah Abu Talib, Hazlie Mokhlis, Mohamad Sofian Abu Talip, Kanendra Naidu, Hadi Suyono
Format: Article
Language:English
Published: MDPI AG 2018-05-01
Series:Energies
Subjects:
Online Access:http://www.mdpi.com/1996-1073/11/5/1316
id doaj-19f7a410e7bf48ff8aab417ee4a4810b
record_format Article
spelling doaj-19f7a410e7bf48ff8aab417ee4a4810b2020-11-24T21:37:12ZengMDPI AGEnergies1996-10732018-05-01115131610.3390/en11051316en11051316Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing IslandsDian Najihah Abu Talib0Hazlie Mokhlis1Mohamad Sofian Abu Talip2Kanendra Naidu3Hadi Suyono4Department of Electrical Engineering, University of Malaya, Kuala Lumpur 50603, MalaysiaDepartment of Electrical Engineering, University of Malaya, Kuala Lumpur 50603, MalaysiaDepartment of Electrical Engineering, University of Malaya, Kuala Lumpur 50603, MalaysiaElectrical Technology Section, University of Kuala Lumpur, British Malaysian Institute, Gombak 53100, Selangor, MalaysiaDepartment of Electrical Engineering, Faculty of Engineering, University of Brawijaya, Malang 65145, IndonesiaCommon power system restoration planning strategy is based on a ‘build up’ approach, where a blackout system is sectionalized among several islands for parallel restoration prior to resynchronization. In order to speed up the resynchronization of the islands, each island must have similar energizing times. However, there is a huge number of possible combinations of islands that can be formed. Thus, this paper proposes a method to determine optimal islands that have similar energizing times. The method involves identifying transmission lines that should not be connected to form the islands. The proposed method is based on the combination of heuristic and discrete optimization methods. The heuristic technique is proposed to find initial solution that is close to the optimal solution. This solution will guide the optimization technique, which is the discrete Artificial Bee Colony optimization method, to find the optimum solution. The proposed method also considers restoration constraints including black start generator availability, load-generation balance, and the maintenance of acceptable voltage magnitude within each island. The proposed method is validated via simulation using IEEE 39, 118-bus and 89-bus European systems. The advantage of the proposed method in terms of restoration time is demonstrated through a comparison with other literature.http://www.mdpi.com/1996-1073/11/5/1316parallel power system restoration planningsystem sectionalizationheuristicdiscrete artificial bee colony (DABC) optimization method
collection DOAJ
language English
format Article
sources DOAJ
author Dian Najihah Abu Talib
Hazlie Mokhlis
Mohamad Sofian Abu Talip
Kanendra Naidu
Hadi Suyono
spellingShingle Dian Najihah Abu Talib
Hazlie Mokhlis
Mohamad Sofian Abu Talip
Kanendra Naidu
Hadi Suyono
Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands
Energies
parallel power system restoration planning
system sectionalization
heuristic
discrete artificial bee colony (DABC) optimization method
author_facet Dian Najihah Abu Talib
Hazlie Mokhlis
Mohamad Sofian Abu Talip
Kanendra Naidu
Hadi Suyono
author_sort Dian Najihah Abu Talib
title Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands
title_short Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands
title_full Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands
title_fullStr Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands
title_full_unstemmed Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands
title_sort power system restoration planning strategy based on optimal energizing time of sectionalizing islands
publisher MDPI AG
series Energies
issn 1996-1073
publishDate 2018-05-01
description Common power system restoration planning strategy is based on a ‘build up’ approach, where a blackout system is sectionalized among several islands for parallel restoration prior to resynchronization. In order to speed up the resynchronization of the islands, each island must have similar energizing times. However, there is a huge number of possible combinations of islands that can be formed. Thus, this paper proposes a method to determine optimal islands that have similar energizing times. The method involves identifying transmission lines that should not be connected to form the islands. The proposed method is based on the combination of heuristic and discrete optimization methods. The heuristic technique is proposed to find initial solution that is close to the optimal solution. This solution will guide the optimization technique, which is the discrete Artificial Bee Colony optimization method, to find the optimum solution. The proposed method also considers restoration constraints including black start generator availability, load-generation balance, and the maintenance of acceptable voltage magnitude within each island. The proposed method is validated via simulation using IEEE 39, 118-bus and 89-bus European systems. The advantage of the proposed method in terms of restoration time is demonstrated through a comparison with other literature.
topic parallel power system restoration planning
system sectionalization
heuristic
discrete artificial bee colony (DABC) optimization method
url http://www.mdpi.com/1996-1073/11/5/1316
work_keys_str_mv AT diannajihahabutalib powersystemrestorationplanningstrategybasedonoptimalenergizingtimeofsectionalizingislands
AT hazliemokhlis powersystemrestorationplanningstrategybasedonoptimalenergizingtimeofsectionalizingislands
AT mohamadsofianabutalip powersystemrestorationplanningstrategybasedonoptimalenergizingtimeofsectionalizingislands
AT kanendranaidu powersystemrestorationplanningstrategybasedonoptimalenergizingtimeofsectionalizingislands
AT hadisuyono powersystemrestorationplanningstrategybasedonoptimalenergizingtimeofsectionalizingislands
_version_ 1725937659126218752