Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands
Common power system restoration planning strategy is based on a ‘build up’ approach, where a blackout system is sectionalized among several islands for parallel restoration prior to resynchronization. In order to speed up the resynchronization of the islands, each island must hav...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2018-05-01
|
Series: | Energies |
Subjects: | |
Online Access: | http://www.mdpi.com/1996-1073/11/5/1316 |
id |
doaj-19f7a410e7bf48ff8aab417ee4a4810b |
---|---|
record_format |
Article |
spelling |
doaj-19f7a410e7bf48ff8aab417ee4a4810b2020-11-24T21:37:12ZengMDPI AGEnergies1996-10732018-05-01115131610.3390/en11051316en11051316Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing IslandsDian Najihah Abu Talib0Hazlie Mokhlis1Mohamad Sofian Abu Talip2Kanendra Naidu3Hadi Suyono4Department of Electrical Engineering, University of Malaya, Kuala Lumpur 50603, MalaysiaDepartment of Electrical Engineering, University of Malaya, Kuala Lumpur 50603, MalaysiaDepartment of Electrical Engineering, University of Malaya, Kuala Lumpur 50603, MalaysiaElectrical Technology Section, University of Kuala Lumpur, British Malaysian Institute, Gombak 53100, Selangor, MalaysiaDepartment of Electrical Engineering, Faculty of Engineering, University of Brawijaya, Malang 65145, IndonesiaCommon power system restoration planning strategy is based on a ‘build up’ approach, where a blackout system is sectionalized among several islands for parallel restoration prior to resynchronization. In order to speed up the resynchronization of the islands, each island must have similar energizing times. However, there is a huge number of possible combinations of islands that can be formed. Thus, this paper proposes a method to determine optimal islands that have similar energizing times. The method involves identifying transmission lines that should not be connected to form the islands. The proposed method is based on the combination of heuristic and discrete optimization methods. The heuristic technique is proposed to find initial solution that is close to the optimal solution. This solution will guide the optimization technique, which is the discrete Artificial Bee Colony optimization method, to find the optimum solution. The proposed method also considers restoration constraints including black start generator availability, load-generation balance, and the maintenance of acceptable voltage magnitude within each island. The proposed method is validated via simulation using IEEE 39, 118-bus and 89-bus European systems. The advantage of the proposed method in terms of restoration time is demonstrated through a comparison with other literature.http://www.mdpi.com/1996-1073/11/5/1316parallel power system restoration planningsystem sectionalizationheuristicdiscrete artificial bee colony (DABC) optimization method |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Dian Najihah Abu Talib Hazlie Mokhlis Mohamad Sofian Abu Talip Kanendra Naidu Hadi Suyono |
spellingShingle |
Dian Najihah Abu Talib Hazlie Mokhlis Mohamad Sofian Abu Talip Kanendra Naidu Hadi Suyono Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands Energies parallel power system restoration planning system sectionalization heuristic discrete artificial bee colony (DABC) optimization method |
author_facet |
Dian Najihah Abu Talib Hazlie Mokhlis Mohamad Sofian Abu Talip Kanendra Naidu Hadi Suyono |
author_sort |
Dian Najihah Abu Talib |
title |
Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands |
title_short |
Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands |
title_full |
Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands |
title_fullStr |
Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands |
title_full_unstemmed |
Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands |
title_sort |
power system restoration planning strategy based on optimal energizing time of sectionalizing islands |
publisher |
MDPI AG |
series |
Energies |
issn |
1996-1073 |
publishDate |
2018-05-01 |
description |
Common power system restoration planning strategy is based on a ‘build up’ approach, where a blackout system is sectionalized among several islands for parallel restoration prior to resynchronization. In order to speed up the resynchronization of the islands, each island must have similar energizing times. However, there is a huge number of possible combinations of islands that can be formed. Thus, this paper proposes a method to determine optimal islands that have similar energizing times. The method involves identifying transmission lines that should not be connected to form the islands. The proposed method is based on the combination of heuristic and discrete optimization methods. The heuristic technique is proposed to find initial solution that is close to the optimal solution. This solution will guide the optimization technique, which is the discrete Artificial Bee Colony optimization method, to find the optimum solution. The proposed method also considers restoration constraints including black start generator availability, load-generation balance, and the maintenance of acceptable voltage magnitude within each island. The proposed method is validated via simulation using IEEE 39, 118-bus and 89-bus European systems. The advantage of the proposed method in terms of restoration time is demonstrated through a comparison with other literature. |
topic |
parallel power system restoration planning system sectionalization heuristic discrete artificial bee colony (DABC) optimization method |
url |
http://www.mdpi.com/1996-1073/11/5/1316 |
work_keys_str_mv |
AT diannajihahabutalib powersystemrestorationplanningstrategybasedonoptimalenergizingtimeofsectionalizingislands AT hazliemokhlis powersystemrestorationplanningstrategybasedonoptimalenergizingtimeofsectionalizingislands AT mohamadsofianabutalip powersystemrestorationplanningstrategybasedonoptimalenergizingtimeofsectionalizingislands AT kanendranaidu powersystemrestorationplanningstrategybasedonoptimalenergizingtimeofsectionalizingislands AT hadisuyono powersystemrestorationplanningstrategybasedonoptimalenergizingtimeofsectionalizingislands |
_version_ |
1725937659126218752 |