Regional transportation development for development at fertilizer plants in North Sumatra (case study)

Supply chain activity has an opportunity for the occurrence of risk. Therefore, risk management is needed in the handling of risk with the aim to minimize the risk level and impact of those risks. PT. XYZ of PT Pupuk Indonesia (Persero) engaged in the fertilizer industry. The main product produced i...

Full description

Bibliographic Details
Main Authors: Siregar Ikhsan, Tambunan Mangara M.
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201823602012
id doaj-19ba2f275c4a4fb1ba0797136df0864a
record_format Article
spelling doaj-19ba2f275c4a4fb1ba0797136df0864a2021-04-02T14:09:33ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-012360201210.1051/matecconf/201823602012matecconf_logi2018_02012Regional transportation development for development at fertilizer plants in North Sumatra (case study)Siregar Ikhsan0Tambunan Mangara M.1Department of Industrial Engineering, Universitas Sumatera Utara, Jl. Almamater Kampus USU,Department of Industrial Engineering, Universitas Sumatera Utara, Jl. Almamater Kampus USU,Supply chain activity has an opportunity for the occurrence of risk. Therefore, risk management is needed in the handling of risk with the aim to minimize the risk level and impact of those risks. PT. XYZ of PT Pupuk Indonesia (Persero) engaged in the fertilizer industry. The main product produced is urea fertilizer. In the production process, the factory is supported by adequate production facilities and international standard technology. Currently, PT XYZ does not yet have risk management which explicitly discusses the proposed risk management along with the handling strategies required by the company. By looking at the current condition of the company, in order to achieve the goals to be achieved the company needs a good supply chain planning such as by identifying the risks that exist in the supply chain and preventive measures. Performed risk analysis and evaluation of potential supply chain companies using HOR (House Of Risk) tools. After the research there were 42 risk events and 42 risk agents. With the 80/20 pareto approach, 9 risk agents are planned for mitigation action. There are 11 recommended risk mitigation actions recommended to the company in the hope of addressing the risk of urea fertilizer supply chain.https://doi.org/10.1051/matecconf/201823602012
collection DOAJ
language English
format Article
sources DOAJ
author Siregar Ikhsan
Tambunan Mangara M.
spellingShingle Siregar Ikhsan
Tambunan Mangara M.
Regional transportation development for development at fertilizer plants in North Sumatra (case study)
MATEC Web of Conferences
author_facet Siregar Ikhsan
Tambunan Mangara M.
author_sort Siregar Ikhsan
title Regional transportation development for development at fertilizer plants in North Sumatra (case study)
title_short Regional transportation development for development at fertilizer plants in North Sumatra (case study)
title_full Regional transportation development for development at fertilizer plants in North Sumatra (case study)
title_fullStr Regional transportation development for development at fertilizer plants in North Sumatra (case study)
title_full_unstemmed Regional transportation development for development at fertilizer plants in North Sumatra (case study)
title_sort regional transportation development for development at fertilizer plants in north sumatra (case study)
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2018-01-01
description Supply chain activity has an opportunity for the occurrence of risk. Therefore, risk management is needed in the handling of risk with the aim to minimize the risk level and impact of those risks. PT. XYZ of PT Pupuk Indonesia (Persero) engaged in the fertilizer industry. The main product produced is urea fertilizer. In the production process, the factory is supported by adequate production facilities and international standard technology. Currently, PT XYZ does not yet have risk management which explicitly discusses the proposed risk management along with the handling strategies required by the company. By looking at the current condition of the company, in order to achieve the goals to be achieved the company needs a good supply chain planning such as by identifying the risks that exist in the supply chain and preventive measures. Performed risk analysis and evaluation of potential supply chain companies using HOR (House Of Risk) tools. After the research there were 42 risk events and 42 risk agents. With the 80/20 pareto approach, 9 risk agents are planned for mitigation action. There are 11 recommended risk mitigation actions recommended to the company in the hope of addressing the risk of urea fertilizer supply chain.
url https://doi.org/10.1051/matecconf/201823602012
work_keys_str_mv AT siregarikhsan regionaltransportationdevelopmentfordevelopmentatfertilizerplantsinnorthsumatracasestudy
AT tambunanmangaram regionaltransportationdevelopmentfordevelopmentatfertilizerplantsinnorthsumatracasestudy
_version_ 1721562891589517312