Life Cycle Cost Comparison Study of PV and Concrete Rooftop in Jakarta

This paper presents a comparative study of “life cycle cost” or LCC of a building school rooftop element in Jakarta. The simulation applied two different types of roof: a concrete roof and a PV rooftop. The aim of this study is to investigate the electricity production of the solar panels, the savin...

Full description

Bibliographic Details
Main Author: Religiana Hendarti
Format: Article
Language:English
Published: Hindawi Limited 2018-01-01
Series:International Journal of Photoenergy
Online Access:http://dx.doi.org/10.1155/2018/9514260
Description
Summary:This paper presents a comparative study of “life cycle cost” or LCC of a building school rooftop element in Jakarta. The simulation applied two different types of roof: a concrete roof and a PV rooftop. The aim of this study is to investigate the electricity production of the solar panels, the saving to investment ratio or SIR, and the total life cycle cost of each rooftop element. To accommodate those objectives, the calculation utilized a software called “Building Life Cycle Cost (BLCC) version 5” which is a product of the US Department of Energy. The simulation results showed that the LCC can be improved by 27.6%, and the “discounted payback” is reached at year 15. Indeed, this indicates that a roof made of solar panels is promising to replace the existing concrete roof.
ISSN:1110-662X