Management system for the control of the Educative Project in the Higher Cuban Education

As part of the training of Cuban university students involved educational project that requires proper control of compliance. At the University of Information Science, is done through a digital model developed by the professor of the group which generates poor control and directly undermines the qua...

Full description

Bibliographic Details
Main Authors: Lionel Rodolfo Baquero Hernández, Dayana Mendoza Peña, Osviel Rodriguez Valdés, Bernardo Hernández González
Format: Article
Language:English
Published: Universidad Distrital Francisco José de Caldas 2016-06-01
Series:Revista Científica
Subjects:
Online Access:http://revistas.udistrital.edu.co/ojs/index.php/revcie/article/view/9712
id doaj-1914f81204824076a3cd6320bebc9274
record_format Article
spelling doaj-1914f81204824076a3cd6320bebc92742020-11-25T01:41:05ZengUniversidad Distrital Francisco José de CaldasRevista Científica0124-22532344-83502016-06-0112410.14483/10.14483/udistrital.jour.RC.2016.24.a87916Management system for the control of the Educative Project in the Higher Cuban EducationLionel Rodolfo Baquero Hernández0Dayana Mendoza Peña1Osviel Rodriguez Valdés2Bernardo Hernández González3Universidad de las Ciencias InformáticasUniversidad de las Ciencias InformáticasUniversidad de las Ciencias InformáticasUniversidad de las Ciencias InformáticasAs part of the training of Cuban university students involved educational project that requires proper control of compliance. At the University of Information Science, is done through a digital model developed by the professor of the group which generates poor control and directly undermines the quality of the process. In this work the solution to the problem as basis of computerization, using OpenUP development methodology, programming language Java Script on the NetBeans platform version 8.0 as Integrated Development Environment, with ExtJS 3.4 framework is detailed, with version 8.0 of the Software Engineering tools Computer Assisted Visual Paradigm for modeling and PostgreSQL 9.3 as a management system database. The system also generates the associated compliance status of the activities that make up the educational project of a group, which facilitates the control and decision making reports.http://revistas.udistrital.edu.co/ojs/index.php/revcie/article/view/9712Control de cumplimientoEducación Superior CubanaProyecto Educativo
collection DOAJ
language English
format Article
sources DOAJ
author Lionel Rodolfo Baquero Hernández
Dayana Mendoza Peña
Osviel Rodriguez Valdés
Bernardo Hernández González
spellingShingle Lionel Rodolfo Baquero Hernández
Dayana Mendoza Peña
Osviel Rodriguez Valdés
Bernardo Hernández González
Management system for the control of the Educative Project in the Higher Cuban Education
Revista Científica
Control de cumplimiento
Educación Superior Cubana
Proyecto Educativo
author_facet Lionel Rodolfo Baquero Hernández
Dayana Mendoza Peña
Osviel Rodriguez Valdés
Bernardo Hernández González
author_sort Lionel Rodolfo Baquero Hernández
title Management system for the control of the Educative Project in the Higher Cuban Education
title_short Management system for the control of the Educative Project in the Higher Cuban Education
title_full Management system for the control of the Educative Project in the Higher Cuban Education
title_fullStr Management system for the control of the Educative Project in the Higher Cuban Education
title_full_unstemmed Management system for the control of the Educative Project in the Higher Cuban Education
title_sort management system for the control of the educative project in the higher cuban education
publisher Universidad Distrital Francisco José de Caldas
series Revista Científica
issn 0124-2253
2344-8350
publishDate 2016-06-01
description As part of the training of Cuban university students involved educational project that requires proper control of compliance. At the University of Information Science, is done through a digital model developed by the professor of the group which generates poor control and directly undermines the quality of the process. In this work the solution to the problem as basis of computerization, using OpenUP development methodology, programming language Java Script on the NetBeans platform version 8.0 as Integrated Development Environment, with ExtJS 3.4 framework is detailed, with version 8.0 of the Software Engineering tools Computer Assisted Visual Paradigm for modeling and PostgreSQL 9.3 as a management system database. The system also generates the associated compliance status of the activities that make up the educational project of a group, which facilitates the control and decision making reports.
topic Control de cumplimiento
Educación Superior Cubana
Proyecto Educativo
url http://revistas.udistrital.edu.co/ojs/index.php/revcie/article/view/9712
work_keys_str_mv AT lionelrodolfobaquerohernandez managementsystemforthecontroloftheeducativeprojectinthehighercubaneducation
AT dayanamendozapena managementsystemforthecontroloftheeducativeprojectinthehighercubaneducation
AT osvielrodriguezvaldes managementsystemforthecontroloftheeducativeprojectinthehighercubaneducation
AT bernardohernandezgonzalez managementsystemforthecontroloftheeducativeprojectinthehighercubaneducation
_version_ 1725042643651526656