Rehabilitation and reconstruction of community housing post-West Nusa Tenggara Earthquake 2018 (A case of Lauk Rurung Timuk and Lauk Rurung Barat Sub-villages, Sembalun Bumbung, Sembalun, East Lombok)

Three strong earthquakes occurred and damaged the infrastructures and human settlements at some regions of West Nusa Tenggara Province in July and August 2018. This paper describes the policy and action taken by Ministry of Public Works and Housing (MPWH), Republic of Indonesia, to assist in the reh...

Full description

Bibliographic Details
Main Author: Saputra Choirul Rama
Format: Article
Language:English
Published: EDP Sciences 2020-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/16/e3sconf_iceedm2020_05017.pdf
id doaj-1819a6558ba84e23b0fc2b4ef4168767
record_format Article
spelling doaj-1819a6558ba84e23b0fc2b4ef41687672021-08-26T09:26:54ZengEDP SciencesE3S Web of Conferences2267-12422020-01-011560501710.1051/e3sconf/202015605017e3sconf_iceedm2020_05017Rehabilitation and reconstruction of community housing post-West Nusa Tenggara Earthquake 2018 (A case of Lauk Rurung Timuk and Lauk Rurung Barat Sub-villages, Sembalun Bumbung, Sembalun, East Lombok)Saputra Choirul Rama0Directorate of Bridge, Directorate General of Highway, Ministry of Public Works and HousingThree strong earthquakes occurred and damaged the infrastructures and human settlements at some regions of West Nusa Tenggara Province in July and August 2018. This paper describes the policy and action taken by Ministry of Public Works and Housing (MPWH), Republic of Indonesia, to assist in the rehabilitation and reconstruction, specifically for the housing. The process started from early September 2018 by Civil Servant Candidate from MPWH together with the society. The action was comprised of three phases: socialization, design, and construction. Those phases are discussed in this paper along with their particular obstacles. The most critical phase is deducted. All the resources were gathered from the law applied in Indonesia, the official instruction of implementation, the technical instructions, interviews and volunteers’ point of views. This paper employed qualitative approach through observation, survey, group discussion, and interview to analyze factors that significantly affected the implementation of rehabilitation and reconstruction of houses by referring to the theory. The results of the study suggest that the socialization phase is found to be the most decisive.https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/16/e3sconf_iceedm2020_05017.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Saputra Choirul Rama
spellingShingle Saputra Choirul Rama
Rehabilitation and reconstruction of community housing post-West Nusa Tenggara Earthquake 2018 (A case of Lauk Rurung Timuk and Lauk Rurung Barat Sub-villages, Sembalun Bumbung, Sembalun, East Lombok)
E3S Web of Conferences
author_facet Saputra Choirul Rama
author_sort Saputra Choirul Rama
title Rehabilitation and reconstruction of community housing post-West Nusa Tenggara Earthquake 2018 (A case of Lauk Rurung Timuk and Lauk Rurung Barat Sub-villages, Sembalun Bumbung, Sembalun, East Lombok)
title_short Rehabilitation and reconstruction of community housing post-West Nusa Tenggara Earthquake 2018 (A case of Lauk Rurung Timuk and Lauk Rurung Barat Sub-villages, Sembalun Bumbung, Sembalun, East Lombok)
title_full Rehabilitation and reconstruction of community housing post-West Nusa Tenggara Earthquake 2018 (A case of Lauk Rurung Timuk and Lauk Rurung Barat Sub-villages, Sembalun Bumbung, Sembalun, East Lombok)
title_fullStr Rehabilitation and reconstruction of community housing post-West Nusa Tenggara Earthquake 2018 (A case of Lauk Rurung Timuk and Lauk Rurung Barat Sub-villages, Sembalun Bumbung, Sembalun, East Lombok)
title_full_unstemmed Rehabilitation and reconstruction of community housing post-West Nusa Tenggara Earthquake 2018 (A case of Lauk Rurung Timuk and Lauk Rurung Barat Sub-villages, Sembalun Bumbung, Sembalun, East Lombok)
title_sort rehabilitation and reconstruction of community housing post-west nusa tenggara earthquake 2018 (a case of lauk rurung timuk and lauk rurung barat sub-villages, sembalun bumbung, sembalun, east lombok)
publisher EDP Sciences
series E3S Web of Conferences
issn 2267-1242
publishDate 2020-01-01
description Three strong earthquakes occurred and damaged the infrastructures and human settlements at some regions of West Nusa Tenggara Province in July and August 2018. This paper describes the policy and action taken by Ministry of Public Works and Housing (MPWH), Republic of Indonesia, to assist in the rehabilitation and reconstruction, specifically for the housing. The process started from early September 2018 by Civil Servant Candidate from MPWH together with the society. The action was comprised of three phases: socialization, design, and construction. Those phases are discussed in this paper along with their particular obstacles. The most critical phase is deducted. All the resources were gathered from the law applied in Indonesia, the official instruction of implementation, the technical instructions, interviews and volunteers’ point of views. This paper employed qualitative approach through observation, survey, group discussion, and interview to analyze factors that significantly affected the implementation of rehabilitation and reconstruction of houses by referring to the theory. The results of the study suggest that the socialization phase is found to be the most decisive.
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/16/e3sconf_iceedm2020_05017.pdf
work_keys_str_mv AT saputrachoirulrama rehabilitationandreconstructionofcommunityhousingpostwestnusatenggaraearthquake2018acaseoflaukrurungtimukandlaukrurungbaratsubvillagessembalunbumbungsembaluneastlombok
_version_ 1721195842993389568