Determination of the work scope for removal of speed restrictions related to the track plan

The greatest number of restrictions is related to the parameters and condition of curvilinear track sections. The technique for determination of cost of reorganization of curves at introduction of high-speed traffic for difficult sections of the track plan is developed. The law of work scope change...

Full description

Bibliographic Details
Main Authors: I.P. Korzhenevich, M.B. Kurgan, N.P. Khmelevs’ka
Format: Article
Language:English
Published: Dnipro National University of Railway Transport named after Academician V. Lazaryan 2012-08-01
Series:Nauka ta progres transportu
Subjects:
Online Access:http://stp.diit.edu.ua/article/view/7878/6707
id doaj-17b172723da44eb8942411febc935584
record_format Article
spelling doaj-17b172723da44eb8942411febc9355842020-11-25T02:32:49Zeng Dnipro National University of Railway Transport named after Academician V. LazaryanNauka ta progres transportu2307-34892307-66662012-08-0141116123Determination of the work scope for removal of speed restrictions related to the track planI.P. KorzhenevichM.B. KurganN.P. Khmelevs’kaThe greatest number of restrictions is related to the parameters and condition of curvilinear track sections. The technique for determination of cost of reorganization of curves at introduction of high-speed traffic for difficult sections of the track plan is developed. The law of work scope change depending on methods of the curve reorganization is established: expanding an existing track bed, adding a new track bed to existing one or shifting a track bed to a new route.http://stp.diit.edu.ua/article/view/7878/6707speed restrictionplan reorganizationwork scopecost of curve reorganization
collection DOAJ
language English
format Article
sources DOAJ
author I.P. Korzhenevich
M.B. Kurgan
N.P. Khmelevs’ka
spellingShingle I.P. Korzhenevich
M.B. Kurgan
N.P. Khmelevs’ka
Determination of the work scope for removal of speed restrictions related to the track plan
Nauka ta progres transportu
speed restriction
plan reorganization
work scope
cost of curve reorganization
author_facet I.P. Korzhenevich
M.B. Kurgan
N.P. Khmelevs’ka
author_sort I.P. Korzhenevich
title Determination of the work scope for removal of speed restrictions related to the track plan
title_short Determination of the work scope for removal of speed restrictions related to the track plan
title_full Determination of the work scope for removal of speed restrictions related to the track plan
title_fullStr Determination of the work scope for removal of speed restrictions related to the track plan
title_full_unstemmed Determination of the work scope for removal of speed restrictions related to the track plan
title_sort determination of the work scope for removal of speed restrictions related to the track plan
publisher Dnipro National University of Railway Transport named after Academician V. Lazaryan
series Nauka ta progres transportu
issn 2307-3489
2307-6666
publishDate 2012-08-01
description The greatest number of restrictions is related to the parameters and condition of curvilinear track sections. The technique for determination of cost of reorganization of curves at introduction of high-speed traffic for difficult sections of the track plan is developed. The law of work scope change depending on methods of the curve reorganization is established: expanding an existing track bed, adding a new track bed to existing one or shifting a track bed to a new route.
topic speed restriction
plan reorganization
work scope
cost of curve reorganization
url http://stp.diit.edu.ua/article/view/7878/6707
work_keys_str_mv AT ipkorzhenevich determinationoftheworkscopeforremovalofspeedrestrictionsrelatedtothetrackplan
AT mbkurgan determinationoftheworkscopeforremovalofspeedrestrictionsrelatedtothetrackplan
AT npkhmelevska determinationoftheworkscopeforremovalofspeedrestrictionsrelatedtothetrackplan
_version_ 1724817493029027840