Modeling an Overcurrent Relay Protection and Coordination in a Power System Network Using PSCAD Software

In power system network, protection system is an important element that needs to be concerned because it is helping isolated an abnormal condition and interruption to the system. The backup relay need a sufficient amount of time delay to let the primary relay function properly first.  For this study...

Full description

Bibliographic Details
Main Author: Mohd Hendra Hairi
Format: Article
Language:English
Published: Penerbit Universiti Teknikal Malaysia Melaka 2021-06-01
Series:International Journal of Electrical Engineering and Applied Sciences
Online Access:https://ijeeas.utem.edu.my/ijeeas/article/view/4153
Description
Summary:In power system network, protection system is an important element that needs to be concerned because it is helping isolated an abnormal condition and interruption to the system. The backup relay need a sufficient amount of time delay to let the primary relay function properly first.  For this study, the IEEE std. C37.112 moderately inverse IDMT curve characteristic for are choose to run the simulation using the Power System Computer Aided Design (PSCAD) by applied a various type and location of fault is proposed in this project. The pick-up current setting and time dial setting will help in order to achieve the desire time margin. The time margin will affect the time taken for next relay to operate and without the proper setting can exposing more hazard to equipment. So the increasing in the time margin will increase the time taken for relay to act during interruption.
ISSN:2600-7495