Investigation of design criteria for Maron hydropower tunnels of ehbahan
The principle of economically optimal design of water conveyance and water supply systems has been one of the major concerns of researchers and designers for along time. In order to design a hydropower plant many combinations of headrace tunnel, penstockand surge tank sizes may be selected.The desig...
Main Authors: | Sadegh Haghighipour, Jamal Mohammad Vali Samani |
---|---|
Format: | Article |
Language: | fas |
Published: |
Shahid Chamran University of Ahvaz
2009-06-01
|
Series: | علوم و مهندسی آبیاری |
Subjects: | |
Online Access: | http://jise.scu.ac.ir/article_13390_d41d8cd98f00b204e9800998ecf8427e.pdf |
Similar Items
-
A Review of the Transient Process and Control for a Hydropower Station with a Super Long Headrace Tunnel
by: Wencheng Guo, et al.
Published: (2018-11-01) -
Simulation Study on Thermo-Mechanical Controlled Process of 800 MPa-Grade Steel for Hydropower Penstocks
by: Qingfeng Ding, et al.
Published: (2016-08-01) -
Critical stable sectional area of downstream surge tank of hydropower plant with sloping ceiling tailrace tunnel
by: Wencheng Guo, et al.
Published: (2021-08-01) -
Implementation and Evaluation of a Complex Pumped-Storage Hydropower Plant with Four Units, Common Penstock, and Surge Tank in a Real-Time Digital Simulator †
by: Akbari, H., et al.
Published: (2023) -
DESIGN OF WATER HAMMER CONTROL STRATEGIES IN HYDROPOWER PLANTS
by: Anton Bergant, et al.
Published: (2018-03-01)