Penentuan Prioritas Strategi Pengelolaan K3 Proyek Pemasangan Pipa Gas Menggunakan Pendekatan Metode AHP
The pipeline is an immobile transport medium that functions to distribute liquids and gases. The pipeline installation project is one of the Engineering Procurement and Construction (EPC) projects that has the potential for accident and occupational safety risks. The purpose of this research is to d...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
2018-08-01
|
Series: | Jurnal Teknik Industri |
Subjects: | |
Online Access: | http://ejournal.umm.ac.id/index.php/industri/article/view/5373 |
id |
doaj-15d7da8b6425414b9bdf12b3cdc55788 |
---|---|
record_format |
Article |
spelling |
doaj-15d7da8b6425414b9bdf12b3cdc557882020-11-24T22:02:07ZengJurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah MalangJurnal Teknik Industri 1978-14312527-41122018-08-0119210711710.22219/JTIUMM.Vol19.No2.107-1174792Penentuan Prioritas Strategi Pengelolaan K3 Proyek Pemasangan Pipa Gas Menggunakan Pendekatan Metode AHPRosita Robi Agustini0Dino Rimantho1PT. Delima AnugerahPancasila UniversityThe pipeline is an immobile transport medium that functions to distribute liquids and gases. The pipeline installation project is one of the Engineering Procurement and Construction (EPC) projects that has the potential for accident and occupational safety risks. The purpose of this research is to determine the priority of work accident management strategies gas pipeline by applying the AHP method. Brainstorming and pair-wise comparison approaches were conducted by experts. A total of three experts are used as key informants in assessing paired comparisons. The results show that there are four main factors that could potentially result in the risk of working accidents such as humans, machines, methods, and materials. Furthermore, based on the analysis result shows that human factor is the highest priority and environmental factor as the lowest priority. The AHP method application in this study indicates that this method can be used to determine the priority of each criterion and sub-criteria on the health and safety management strategy of the gas pipeline installation project. The implication of this in the application of AHP in other issues required more in-depth review related to the criteria and sub-criteria that are used to obtain more comprehensive results.http://ejournal.umm.ac.id/index.php/industri/article/view/5373AHP, EPC, Strategy, Health and safety, Gas Pipeline, SOP |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Rosita Robi Agustini Dino Rimantho |
spellingShingle |
Rosita Robi Agustini Dino Rimantho Penentuan Prioritas Strategi Pengelolaan K3 Proyek Pemasangan Pipa Gas Menggunakan Pendekatan Metode AHP Jurnal Teknik Industri AHP, EPC, Strategy, Health and safety, Gas Pipeline, SOP |
author_facet |
Rosita Robi Agustini Dino Rimantho |
author_sort |
Rosita Robi Agustini |
title |
Penentuan Prioritas Strategi Pengelolaan K3 Proyek Pemasangan Pipa Gas Menggunakan Pendekatan Metode AHP |
title_short |
Penentuan Prioritas Strategi Pengelolaan K3 Proyek Pemasangan Pipa Gas Menggunakan Pendekatan Metode AHP |
title_full |
Penentuan Prioritas Strategi Pengelolaan K3 Proyek Pemasangan Pipa Gas Menggunakan Pendekatan Metode AHP |
title_fullStr |
Penentuan Prioritas Strategi Pengelolaan K3 Proyek Pemasangan Pipa Gas Menggunakan Pendekatan Metode AHP |
title_full_unstemmed |
Penentuan Prioritas Strategi Pengelolaan K3 Proyek Pemasangan Pipa Gas Menggunakan Pendekatan Metode AHP |
title_sort |
penentuan prioritas strategi pengelolaan k3 proyek pemasangan pipa gas menggunakan pendekatan metode ahp |
publisher |
Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang |
series |
Jurnal Teknik Industri |
issn |
1978-1431 2527-4112 |
publishDate |
2018-08-01 |
description |
The pipeline is an immobile transport medium that functions to distribute liquids and gases. The pipeline installation project is one of the Engineering Procurement and Construction (EPC) projects that has the potential for accident and occupational safety risks. The purpose of this research is to determine the priority of work accident management strategies gas pipeline by applying the AHP method. Brainstorming and pair-wise comparison approaches were conducted by experts. A total of three experts are used as key informants in assessing paired comparisons. The results show that there are four main factors that could potentially result in the risk of working accidents such as humans, machines, methods, and materials. Furthermore, based on the analysis result shows that human factor is the highest priority and environmental factor as the lowest priority. The AHP method application in this study indicates that this method can be used to determine the priority of each criterion and sub-criteria on the health and safety management strategy of the gas pipeline installation project. The implication of this in the application of AHP in other issues required more in-depth review related to the criteria and sub-criteria that are used to obtain more comprehensive results. |
topic |
AHP, EPC, Strategy, Health and safety, Gas Pipeline, SOP |
url |
http://ejournal.umm.ac.id/index.php/industri/article/view/5373 |
work_keys_str_mv |
AT rositarobiagustini penentuanprioritasstrategipengelolaank3proyekpemasanganpipagasmenggunakanpendekatanmetodeahp AT dinorimantho penentuanprioritasstrategipengelolaank3proyekpemasanganpipagasmenggunakanpendekatanmetodeahp |
_version_ |
1725836806901989376 |