Pathology of Public Participation in Renovation and Improvement of Urban Structure in Abkouh Neighborhood in Mashhad

The passage of time and the experience gained from various measures of renovation and reconstruction in different cities and countries have shown that these processes, without the participation of the people and their involvement, cannot lead to a desirable outcome, and it is essential that public p...

Full description

Bibliographic Details
Main Authors: Setareh Mehrvarz, Baratali Khakpor, Mohamad Rahim Rahnama
Format: Article
Language:fas
Published: Afarand Scholarly Publishing Institute 2018-03-01
Series:تحقيقات جغرافيايی
Subjects:
Online Access:http://georesearch.ir/article-1-364-en.html
id doaj-1599be1a586a43c8b4b2bc16e05354ab
record_format Article
spelling doaj-1599be1a586a43c8b4b2bc16e05354ab2020-11-25T02:25:56ZfasAfarand Scholarly Publishing Instituteتحقيقات جغرافيايی1019-70522538-43842018-03-013243046Pathology of Public Participation in Renovation and Improvement of Urban Structure in Abkouh Neighborhood in MashhadSetareh Mehrvarz0Baratali Khakpor1Mohamad Rahim Rahnama2 Department of Geography and urban planning, Ferdowsi University, Mashhad, Iran Department of Geography and urban planning, Ferdowsi University, Mashhad, Iran Department of Geography and urban planning, Ferdowsi University, Mashhad, Iran The passage of time and the experience gained from various measures of renovation and reconstruction in different cities and countries have shown that these processes, without the participation of the people and their involvement, cannot lead to a desirable outcome, and it is essential that public participation and their role in the relevant processes is considered. In this research, SWOT technique and identification of strengths, weaknesses, opportunities and threats of popular participation were used to study the issue of public participation in refurbishing and renovating the fabric of the Abkouh metropolitan area of Mashhad, and realizing the status quo. The information was collected through open questions and interviews by 20 experts and specialists. The results of the survey showed that, although in this neighborhood, there are many opportunities such as "agreeing to implement the plan in the neighborhood in the case of popular participation", "high unofficial participation in the neighborhood (community council activity, high level of participation in religious affairs, charity etc.), "the existence of a sense of participation within the neighborhood," "the dedication of the population and their desire to continue living in the neighborhood" and "attention to peoplechr('39')s participation approach in the design plan". However, along with that, the various disadvantages of the neighborhood, such as "the lack of organization of mechanisms and appropriate methods and participatory institutions,", "the multiplicity of organizations responsible for the issue (Astan Quds, Endowment Organization, Municipality, etc.) and the lack of integrated management in the implementation of the plan "," Household financial problems in the area and low income levels"," Lack of trust in authorities and fear of official participation "and" Lack of state and legal support of local councils and organizations " and other reasons have led to a desirable outcome in this regard. In this regard, various strategies have been proposed to increase the participation of people in the plan. It is necessary that the project managers and planners pay more attention to the actual participation of the residents and provide the mechanisms and requirements for the participation of the people in the implementation of the plan, in accordance with the conditions and characteristics of the residents.http://georesearch.ir/article-1-364-en.htmlpopular participationpathologyimprovement and modernizationabkouh neighborhood‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬
collection DOAJ
language fas
format Article
sources DOAJ
author Setareh Mehrvarz
Baratali Khakpor
Mohamad Rahim Rahnama
spellingShingle Setareh Mehrvarz
Baratali Khakpor
Mohamad Rahim Rahnama
Pathology of Public Participation in Renovation and Improvement of Urban Structure in Abkouh Neighborhood in Mashhad
تحقيقات جغرافيايی
popular participation
pathology
improvement and modernization
abkouh neighborhood‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬
author_facet Setareh Mehrvarz
Baratali Khakpor
Mohamad Rahim Rahnama
author_sort Setareh Mehrvarz
title Pathology of Public Participation in Renovation and Improvement of Urban Structure in Abkouh Neighborhood in Mashhad
title_short Pathology of Public Participation in Renovation and Improvement of Urban Structure in Abkouh Neighborhood in Mashhad
title_full Pathology of Public Participation in Renovation and Improvement of Urban Structure in Abkouh Neighborhood in Mashhad
title_fullStr Pathology of Public Participation in Renovation and Improvement of Urban Structure in Abkouh Neighborhood in Mashhad
title_full_unstemmed Pathology of Public Participation in Renovation and Improvement of Urban Structure in Abkouh Neighborhood in Mashhad
title_sort pathology of public participation in renovation and improvement of urban structure in abkouh neighborhood in mashhad
publisher Afarand Scholarly Publishing Institute
series تحقيقات جغرافيايی
issn 1019-7052
2538-4384
publishDate 2018-03-01
description The passage of time and the experience gained from various measures of renovation and reconstruction in different cities and countries have shown that these processes, without the participation of the people and their involvement, cannot lead to a desirable outcome, and it is essential that public participation and their role in the relevant processes is considered. In this research, SWOT technique and identification of strengths, weaknesses, opportunities and threats of popular participation were used to study the issue of public participation in refurbishing and renovating the fabric of the Abkouh metropolitan area of Mashhad, and realizing the status quo. The information was collected through open questions and interviews by 20 experts and specialists. The results of the survey showed that, although in this neighborhood, there are many opportunities such as "agreeing to implement the plan in the neighborhood in the case of popular participation", "high unofficial participation in the neighborhood (community council activity, high level of participation in religious affairs, charity etc.), "the existence of a sense of participation within the neighborhood," "the dedication of the population and their desire to continue living in the neighborhood" and "attention to peoplechr('39')s participation approach in the design plan". However, along with that, the various disadvantages of the neighborhood, such as "the lack of organization of mechanisms and appropriate methods and participatory institutions,", "the multiplicity of organizations responsible for the issue (Astan Quds, Endowment Organization, Municipality, etc.) and the lack of integrated management in the implementation of the plan "," Household financial problems in the area and low income levels"," Lack of trust in authorities and fear of official participation "and" Lack of state and legal support of local councils and organizations " and other reasons have led to a desirable outcome in this regard. In this regard, various strategies have been proposed to increase the participation of people in the plan. It is necessary that the project managers and planners pay more attention to the actual participation of the residents and provide the mechanisms and requirements for the participation of the people in the implementation of the plan, in accordance with the conditions and characteristics of the residents.
topic popular participation
pathology
improvement and modernization
abkouh neighborhood‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬
url http://georesearch.ir/article-1-364-en.html
work_keys_str_mv AT setarehmehrvarz pathologyofpublicparticipationinrenovationandimprovementofurbanstructureinabkouhneighborhoodinmashhad
AT baratalikhakpor pathologyofpublicparticipationinrenovationandimprovementofurbanstructureinabkouhneighborhoodinmashhad
AT mohamadrahimrahnama pathologyofpublicparticipationinrenovationandimprovementofurbanstructureinabkouhneighborhoodinmashhad
_version_ 1724849382629572608