A Short Turning Strategy for Train Scheduling Optimization in an Urban Rail Transit Line: The Case of Beijing Subway Line 4

In urban rail transit systems, train scheduling plays an important role in improving the transport capacity to alleviate the urban traffic pressure of huge passenger demand and reducing the operation costs for operators. This paper considers the train scheduling with short turning strategy for an ur...

Full description

Bibliographic Details
Main Authors: Miao Zhang, Yihui Wang, Shuai Su, Tao Tang, Bin Ning
Format: Article
Language:English
Published: Hindawi-Wiley 2018-01-01
Series:Journal of Advanced Transportation
Online Access:http://dx.doi.org/10.1155/2018/5367295
id doaj-14818494baf44d5689bb224b74096877
record_format Article
spelling doaj-14818494baf44d5689bb224b740968772020-11-24T21:26:41ZengHindawi-WileyJournal of Advanced Transportation0197-67292042-31952018-01-01201810.1155/2018/53672955367295A Short Turning Strategy for Train Scheduling Optimization in an Urban Rail Transit Line: The Case of Beijing Subway Line 4Miao Zhang0Yihui Wang1Shuai Su2Tao Tang3Bin Ning4State Key Laboratory of Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, ChinaState Key Laboratory of Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, ChinaState Key Laboratory of Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, ChinaState Key Laboratory of Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, ChinaState Key Laboratory of Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, ChinaIn urban rail transit systems, train scheduling plays an important role in improving the transport capacity to alleviate the urban traffic pressure of huge passenger demand and reducing the operation costs for operators. This paper considers the train scheduling with short turning strategy for an urban rail transit line with multiple depots. In addition, the utilization of trains is also taken into consideration. First, we develop a mixed integer nonlinear programming (MINLP) model for the train scheduling, where short turning train services and full-length train services are optimized based on the predefined headway obtained by the passenger demand analysis. The MINLP model is then transformed into a mixed integer linear programming (MILP) model according to several transformation properties. The resulting MILP problem can be solved efficiently by existing solvers, e.g., CPLEX. Two case studies with different scales are constructed to assess the performance of train schedules with the short turning strategy based on the data of Beijing Subway line 4. The simulation results show that the reduction of the utilization of trains is about 20.69%.http://dx.doi.org/10.1155/2018/5367295
collection DOAJ
language English
format Article
sources DOAJ
author Miao Zhang
Yihui Wang
Shuai Su
Tao Tang
Bin Ning
spellingShingle Miao Zhang
Yihui Wang
Shuai Su
Tao Tang
Bin Ning
A Short Turning Strategy for Train Scheduling Optimization in an Urban Rail Transit Line: The Case of Beijing Subway Line 4
Journal of Advanced Transportation
author_facet Miao Zhang
Yihui Wang
Shuai Su
Tao Tang
Bin Ning
author_sort Miao Zhang
title A Short Turning Strategy for Train Scheduling Optimization in an Urban Rail Transit Line: The Case of Beijing Subway Line 4
title_short A Short Turning Strategy for Train Scheduling Optimization in an Urban Rail Transit Line: The Case of Beijing Subway Line 4
title_full A Short Turning Strategy for Train Scheduling Optimization in an Urban Rail Transit Line: The Case of Beijing Subway Line 4
title_fullStr A Short Turning Strategy for Train Scheduling Optimization in an Urban Rail Transit Line: The Case of Beijing Subway Line 4
title_full_unstemmed A Short Turning Strategy for Train Scheduling Optimization in an Urban Rail Transit Line: The Case of Beijing Subway Line 4
title_sort short turning strategy for train scheduling optimization in an urban rail transit line: the case of beijing subway line 4
publisher Hindawi-Wiley
series Journal of Advanced Transportation
issn 0197-6729
2042-3195
publishDate 2018-01-01
description In urban rail transit systems, train scheduling plays an important role in improving the transport capacity to alleviate the urban traffic pressure of huge passenger demand and reducing the operation costs for operators. This paper considers the train scheduling with short turning strategy for an urban rail transit line with multiple depots. In addition, the utilization of trains is also taken into consideration. First, we develop a mixed integer nonlinear programming (MINLP) model for the train scheduling, where short turning train services and full-length train services are optimized based on the predefined headway obtained by the passenger demand analysis. The MINLP model is then transformed into a mixed integer linear programming (MILP) model according to several transformation properties. The resulting MILP problem can be solved efficiently by existing solvers, e.g., CPLEX. Two case studies with different scales are constructed to assess the performance of train schedules with the short turning strategy based on the data of Beijing Subway line 4. The simulation results show that the reduction of the utilization of trains is about 20.69%.
url http://dx.doi.org/10.1155/2018/5367295
work_keys_str_mv AT miaozhang ashortturningstrategyfortrainschedulingoptimizationinanurbanrailtransitlinethecaseofbeijingsubwayline4
AT yihuiwang ashortturningstrategyfortrainschedulingoptimizationinanurbanrailtransitlinethecaseofbeijingsubwayline4
AT shuaisu ashortturningstrategyfortrainschedulingoptimizationinanurbanrailtransitlinethecaseofbeijingsubwayline4
AT taotang ashortturningstrategyfortrainschedulingoptimizationinanurbanrailtransitlinethecaseofbeijingsubwayline4
AT binning ashortturningstrategyfortrainschedulingoptimizationinanurbanrailtransitlinethecaseofbeijingsubwayline4
AT miaozhang shortturningstrategyfortrainschedulingoptimizationinanurbanrailtransitlinethecaseofbeijingsubwayline4
AT yihuiwang shortturningstrategyfortrainschedulingoptimizationinanurbanrailtransitlinethecaseofbeijingsubwayline4
AT shuaisu shortturningstrategyfortrainschedulingoptimizationinanurbanrailtransitlinethecaseofbeijingsubwayline4
AT taotang shortturningstrategyfortrainschedulingoptimizationinanurbanrailtransitlinethecaseofbeijingsubwayline4
AT binning shortturningstrategyfortrainschedulingoptimizationinanurbanrailtransitlinethecaseofbeijingsubwayline4
_version_ 1725978076626550784