Remediation of 1,2 DCA in Fractured Bedrock Using EHC® ISCR

Objectives Remediation of 1,2 DCA in fractured bedrock was conducted using the EHC® amendment. EHC amendment treats 1,2DCA via in situ chemical reduction (ISCR) and by creating reducing conditions in the aquifer. Injection methods used to place EHC and results from one year of post-injection samplin...

Full description

Bibliographic Details
Main Authors: JIM MUELLER, FAYZ LAKHWALA, ED VANYO, JOHN M.(JAY) ASH
Format: Article
Language:English
Published: Associação Brasileira de Águas Subterrâneas 2013-12-01
Series:Revista Águas Subterrâneas
Online Access:https://aguassubterraneas.abas.org/asubterraneas/article/view/27537
id doaj-1466ef96122048329bbf1d3b1e959ee3
record_format Article
spelling doaj-1466ef96122048329bbf1d3b1e959ee32020-11-25T01:21:16ZengAssociação Brasileira de Águas SubterrâneasRevista Águas Subterrâneas0101-70042179-97842013-12-010016270Remediation of 1,2 DCA in Fractured Bedrock Using EHC® ISCRJIM MUELLER0FAYZ LAKHWALA1ED VANYO2JOHN M.(JAY) ASH3FMC CorporationFMC CorporationAMO Environmental DecisionsAMO Environmental DecisionsObjectives Remediation of 1,2 DCA in fractured bedrock was conducted using the EHC® amendment. EHC amendment treats 1,2DCA via in situ chemical reduction (ISCR) and by creating reducing conditions in the aquifer. Injection methods used to place EHC and results from one year of post-injection sampling from the pilot test will be presented to show the efficacy of EHC in treating 1,2DCA. Remediation plan for full-scale application (scheduled for Nov 2012) will also be presented. Approach EHC is a solid amendment consisting of slow release organic carbon and zero valent iron (ZVI) which promotes biological and chemical reduction of a variety of chlorinated ethenes and ethanes by creating favorable geochemical conditions. Pilot tests were conducted by hydraulic fracturing in partially weathered bedrock at an industrial site located in southeast Pennsylvania. Fractures were created to inject EHC thereby inducing ISCR to destroy 1,2 DCA which was the primary constituent of interest (COI). A total of seven fractures were created in two areas to inject 10,800 lb of EHC. Distribution and radius of influence of EHC in the aquifer was monitored using conventional and non-conventional methods. Several rounds of groundwater samples were collected to monitor the concentration of 1,2 DCA along with secondary geochemical parameters in support of ISCR. Results Data from injection pressure logs indicated that the fractures were nucleated horizontally. Tilt meter data showed symmetric deformations around the injection wells and subsequent analysis strongly suggested horizontal fracture development. Finally, magnets were deployed to trap ZVI from EHC in lubricating water during post-injection coring around the injection points. Collectively, these data sets suggested that the fractures remained “on plane” with the injection elevation for distances in excess of 50 feet from the injection location. Data from several rounds of groundwater samples collected over a period of 12 months show decreasing trends in 1,2 DCA concentration along with supporting trends in geochemical parameters to show that ISCR conditions were established post-EHC injections.https://aguassubterraneas.abas.org/asubterraneas/article/view/27537
collection DOAJ
language English
format Article
sources DOAJ
author JIM MUELLER
FAYZ LAKHWALA
ED VANYO
JOHN M.(JAY) ASH
spellingShingle JIM MUELLER
FAYZ LAKHWALA
ED VANYO
JOHN M.(JAY) ASH
Remediation of 1,2 DCA in Fractured Bedrock Using EHC® ISCR
Revista Águas Subterrâneas
author_facet JIM MUELLER
FAYZ LAKHWALA
ED VANYO
JOHN M.(JAY) ASH
author_sort JIM MUELLER
title Remediation of 1,2 DCA in Fractured Bedrock Using EHC® ISCR
title_short Remediation of 1,2 DCA in Fractured Bedrock Using EHC® ISCR
title_full Remediation of 1,2 DCA in Fractured Bedrock Using EHC® ISCR
title_fullStr Remediation of 1,2 DCA in Fractured Bedrock Using EHC® ISCR
title_full_unstemmed Remediation of 1,2 DCA in Fractured Bedrock Using EHC® ISCR
title_sort remediation of 1,2 dca in fractured bedrock using ehc® iscr
publisher Associação Brasileira de Águas Subterrâneas
series Revista Águas Subterrâneas
issn 0101-7004
2179-9784
publishDate 2013-12-01
description Objectives Remediation of 1,2 DCA in fractured bedrock was conducted using the EHC® amendment. EHC amendment treats 1,2DCA via in situ chemical reduction (ISCR) and by creating reducing conditions in the aquifer. Injection methods used to place EHC and results from one year of post-injection sampling from the pilot test will be presented to show the efficacy of EHC in treating 1,2DCA. Remediation plan for full-scale application (scheduled for Nov 2012) will also be presented. Approach EHC is a solid amendment consisting of slow release organic carbon and zero valent iron (ZVI) which promotes biological and chemical reduction of a variety of chlorinated ethenes and ethanes by creating favorable geochemical conditions. Pilot tests were conducted by hydraulic fracturing in partially weathered bedrock at an industrial site located in southeast Pennsylvania. Fractures were created to inject EHC thereby inducing ISCR to destroy 1,2 DCA which was the primary constituent of interest (COI). A total of seven fractures were created in two areas to inject 10,800 lb of EHC. Distribution and radius of influence of EHC in the aquifer was monitored using conventional and non-conventional methods. Several rounds of groundwater samples were collected to monitor the concentration of 1,2 DCA along with secondary geochemical parameters in support of ISCR. Results Data from injection pressure logs indicated that the fractures were nucleated horizontally. Tilt meter data showed symmetric deformations around the injection wells and subsequent analysis strongly suggested horizontal fracture development. Finally, magnets were deployed to trap ZVI from EHC in lubricating water during post-injection coring around the injection points. Collectively, these data sets suggested that the fractures remained “on plane” with the injection elevation for distances in excess of 50 feet from the injection location. Data from several rounds of groundwater samples collected over a period of 12 months show decreasing trends in 1,2 DCA concentration along with supporting trends in geochemical parameters to show that ISCR conditions were established post-EHC injections.
url https://aguassubterraneas.abas.org/asubterraneas/article/view/27537
work_keys_str_mv AT jimmueller remediationof12dcainfracturedbedrockusingehciscr
AT fayzlakhwala remediationof12dcainfracturedbedrockusingehciscr
AT edvanyo remediationof12dcainfracturedbedrockusingehciscr
AT johnmjayash remediationof12dcainfracturedbedrockusingehciscr
_version_ 1725131252212695040