ANALYSIS OF SYSTEM CONNECTIONS OF THE TECHNOLOGICAL UNIT FUNCTIONING INDICATORS AND SOLVING THE PROBLEM OF CHOOSING OPTIONS FOR RESERVE CALCULATION BASED ON GEOPHYSICAL DATA
Background. The work carried out a comprehensive analysis system connection the main technical and technological parameters operation technological units of the underground well leaching mine uranium. Materials and methods. The analysis was based on the development an information model technolog...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Penza State University Publishing House
2020-06-01
|
Series: | Известия высших учебных заведений. Поволжский регион:Технические науки |
Subjects: |
id |
doaj-13d62c4363b1467ca3c7b64a36bbac42 |
---|---|
record_format |
Article |
spelling |
doaj-13d62c4363b1467ca3c7b64a36bbac422020-11-25T01:59:44ZengPenza State University Publishing HouseИзвестия высших учебных заведений. Поволжский регион:Технические науки2072-30592020-06-01210.21685/2072-3059-2020-2-4ANALYSIS OF SYSTEM CONNECTIONS OF THE TECHNOLOGICAL UNIT FUNCTIONING INDICATORS AND SOLVING THE PROBLEM OF CHOOSING OPTIONS FOR RESERVE CALCULATION BASED ON GEOPHYSICAL DATAD. R. Podrezov0MISIS National University of Science and TechnologyBackground. The work carried out a comprehensive analysis system connection the main technical and technological parameters operation technological units of the underground well leaching mine uranium. Materials and methods. The analysis was based on the development an information model technological wells operation, which allowed to determine the relationships between the main volume and quality development indicators of reserves at the field, such as: mining mass volumes; the opened stocks volumes; metal extraction; average uranium concentration; an ore interval size. Results. The geological and technological information analysis carried out within the framework information model developed, as well as evolution assessment reserves during the development the field blocks showed that 76% the functioning technological blocks at the field show re-attraction by actual indicators or expected in the near future by forecast estimates. In order to adequately estimate the technological unit’s reserves, the initial set factor features determining the opened reserves volumes and the production volumes at the field was formed: effective capacity interval acidified productive horizon; unit process wells grouping; the technological block area. Conclusions. The inventory conversion results showed that the actual uranium reserves in the subsoil did not correspond to the actual development. In addition, it was found that the exposed reserves systematic underestimation was also related to the uranium content calculation in ore intervals, which is, to the radioactive equilibrium coefficient taken into account value.factor groupingssystem communicationsfunctioning efficiencythe choice problemstocks calculation |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
D. R. Podrezov |
spellingShingle |
D. R. Podrezov ANALYSIS OF SYSTEM CONNECTIONS OF THE TECHNOLOGICAL UNIT FUNCTIONING INDICATORS AND SOLVING THE PROBLEM OF CHOOSING OPTIONS FOR RESERVE CALCULATION BASED ON GEOPHYSICAL DATA Известия высших учебных заведений. Поволжский регион:Технические науки factor groupings system communications functioning efficiency the choice problem stocks calculation |
author_facet |
D. R. Podrezov |
author_sort |
D. R. Podrezov |
title |
ANALYSIS OF SYSTEM CONNECTIONS OF THE TECHNOLOGICAL UNIT FUNCTIONING INDICATORS AND SOLVING THE PROBLEM OF CHOOSING OPTIONS FOR RESERVE CALCULATION BASED ON GEOPHYSICAL DATA |
title_short |
ANALYSIS OF SYSTEM CONNECTIONS OF THE TECHNOLOGICAL UNIT FUNCTIONING INDICATORS AND SOLVING THE PROBLEM OF CHOOSING OPTIONS FOR RESERVE CALCULATION BASED ON GEOPHYSICAL DATA |
title_full |
ANALYSIS OF SYSTEM CONNECTIONS OF THE TECHNOLOGICAL UNIT FUNCTIONING INDICATORS AND SOLVING THE PROBLEM OF CHOOSING OPTIONS FOR RESERVE CALCULATION BASED ON GEOPHYSICAL DATA |
title_fullStr |
ANALYSIS OF SYSTEM CONNECTIONS OF THE TECHNOLOGICAL UNIT FUNCTIONING INDICATORS AND SOLVING THE PROBLEM OF CHOOSING OPTIONS FOR RESERVE CALCULATION BASED ON GEOPHYSICAL DATA |
title_full_unstemmed |
ANALYSIS OF SYSTEM CONNECTIONS OF THE TECHNOLOGICAL UNIT FUNCTIONING INDICATORS AND SOLVING THE PROBLEM OF CHOOSING OPTIONS FOR RESERVE CALCULATION BASED ON GEOPHYSICAL DATA |
title_sort |
analysis of system connections of the technological unit functioning indicators and solving the problem of choosing options for reserve calculation based on geophysical data |
publisher |
Penza State University Publishing House |
series |
Известия высших учебных заведений. Поволжский регион:Технические науки |
issn |
2072-3059 |
publishDate |
2020-06-01 |
description |
Background. The work carried out a comprehensive analysis system connection
the main technical and technological parameters operation technological units of the
underground well leaching mine uranium.
Materials and methods. The analysis was based on the development an information
model technological wells operation, which allowed to determine the relationships
between the main volume and quality development indicators of reserves
at the field, such as: mining mass volumes; the opened stocks volumes; metal extraction;
average uranium concentration; an ore interval size.
Results. The geological and technological information analysis carried out within
the framework information model developed, as well as evolution assessment reserves
during the development the field blocks showed that 76% the functioning
technological blocks at the field show re-attraction by actual indicators or expected
in the near future by forecast estimates. In order to adequately estimate the technological
unit’s reserves, the initial set factor features determining the opened reserves
volumes and the production volumes at the field was formed: effective capacity interval
acidified productive horizon; unit process wells grouping; the technological
block area.
Conclusions. The inventory conversion results showed that the actual uranium
reserves in the subsoil did not correspond to the actual development. In addition, it
was found that the exposed reserves systematic underestimation was also related to
the uranium content calculation in ore intervals, which is, to the radioactive equilibrium
coefficient taken into account value. |
topic |
factor groupings system communications functioning efficiency the choice problem stocks calculation |
work_keys_str_mv |
AT drpodrezov analysisofsystemconnectionsofthetechnologicalunitfunctioningindicatorsandsolvingtheproblemofchoosingoptionsforreservecalculationbasedongeophysicaldata |
_version_ |
1724962911909052416 |