Robust Proactive Project Scheduling Model for the Stochastic Discrete Time/Cost Trade-Off Problem
We study the project budget version of the stochastic discrete time/cost trade-off problem (SDTCTP-B) from the viewpoint of the robustness in the scheduling. Given the project budget and a set of activity execution modes, each with uncertain activity time and cost, the objective of the SDTCTP-B is t...
Main Authors: | Hongbo Li, Zhe Xu, Li Xiong, Yinbin Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2015-01-01
|
Series: | Discrete Dynamics in Nature and Society |
Online Access: | http://dx.doi.org/10.1155/2015/586087 |
Similar Items
-
Bi-Objective Scheduling Optimization for Discrete Time/Cost Trade-Off in Projects
by: Hongbo Li, et al.
Published: (2018-08-01) -
Discrete Time/cost Trade-off Problem In Project Scheduling
by: Hafizoglu, Ahmet Baykal
Published: (2007) -
THE DISCRETE TIME, COST AND QUALITY TRADE-OFF PROBLEM IN PROJECT SCHEDULING: AN EFFICIENT SOLUTION METHOD BASED ON CELLDE ALGORITHM
by: Gh. Assadipour, et al.
Published: (2012-01-01) -
Relative Average Deviation as Measure of Robustness in the Stochastic Project Scheduling Problem
by: Néstor Raúl Ortiz-Pimiento, M.Sc., et al.
Published: (2019-06-01) -
Trading off Time–Cost–Quality in Construction Project Scheduling Problems with Fuzzy SWARA–TOPSIS Approach
by: Sayyid Ali Banihashemi, et al.
Published: (2021-08-01)