Formula Development and Application of Wall Protection Slurry for Long-distance Horizontal Freezing Boreholes and Thorough Piles
Since complex barriers need to be passed through during the process of drilling long-distance horizontal freezing boreholes, the stability of the borehole wall at the soft and hard stratum interface is the key in controlling the deflection of the horizontal boreholes. The author puts forward to esta...
Main Authors: | Jiang Guojing, Zhou Xiaomin, Li Fangzheng, Gao Wei, Sun Jianrong, Han Yufu, Yang Zhigang |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2020-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/78/e3sconf_iseese2020_03026.pdf |
Similar Items
-
Accuracy Check and Comparative Analysis of Horizontal Fiber-Optic Gyro Inclinometer in Freezing Hole
by: Jiang Guojing, et al.
Published: (2020-01-01) -
Research on Fresh and Hardened Sealing Slurries with the Addition of Magnesium Regarding Thermal Conductivity for Energy Piles and Borehole Heat Exchangers
by: Tomasz Sliwa, et al.
Published: (2021-08-01) -
Reduction of Fractionation of Lightweight Slurry to Geothermal Boreholes
by: Marcin Kremieniewski, et al.
Published: (2021-06-01) -
Thorough;
by: White, David Allen, M. Arch Massachusetts Institute of Technology.
Published: (2021) -
Teneligliptin and “Thorough QTc study”: thorough enough?
by: Ghosal S
Published: (2019-07-01)