METHODOLOGY OF SYSTEM APPROACHE TO SEISMIC RISK ASSESSMENT AND REDUCTION
Abstract. Ensuring of urban areas seismic safety is a task which do not require delay. But it cannot be solved by separate parts. It is essential that all components of the seismic hazard must be grouped together in one problem based on the system approach. In the present paper is presented not only...
Main Authors: | , |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Daghestan State Technical University
2016-07-01
|
Series: | Vestnik Dagestanskogo Gosudarstvennogo Tehničeskogo Universiteta: Tehničeskie Nauki |
Subjects: | |
Online Access: | https://vestnik.dgtu.ru/jour/article/view/121 |
id |
doaj-123def7904b44eb2bc74489c0c90c540 |
---|---|
record_format |
Article |
spelling |
doaj-123def7904b44eb2bc74489c0c90c5402021-07-28T20:54:33ZrusDaghestan State Technical UniversityVestnik Dagestanskogo Gosudarstvennogo Tehničeskogo Universiteta: Tehničeskie Nauki 2073-61852542-095X2016-07-0141210411210.21822/2073-6185-2016-41-2-104-112120METHODOLOGY OF SYSTEM APPROACHE TO SEISMIC RISK ASSESSMENT AND REDUCTIONA. D. Abakarov0I. B. Kurbanov1FSBEE HE «Dagestan state technical University»the Geophysical service RASAbstract. Ensuring of urban areas seismic safety is a task which do not require delay. But it cannot be solved by separate parts. It is essential that all components of the seismic hazard must be grouped together in one problem based on the system approach. In the present paper is presented not only the main flowchart of systems approach to ensuring the territory seismic safety but also the flowcharts of components of each main unit. They cover the whole package of measures for a full assessment of territory seismic hazard, seismic risk and its reduction.The proposed methodology can be carried out for design and implementation of regional territory seismic safety programs.https://vestnik.dgtu.ru/jour/article/view/121system approachseismic hazardseismic risk elementsvulnerabilityseismic riskacceptable riskseismic risk reduction |
collection |
DOAJ |
language |
Russian |
format |
Article |
sources |
DOAJ |
author |
A. D. Abakarov I. B. Kurbanov |
spellingShingle |
A. D. Abakarov I. B. Kurbanov METHODOLOGY OF SYSTEM APPROACHE TO SEISMIC RISK ASSESSMENT AND REDUCTION Vestnik Dagestanskogo Gosudarstvennogo Tehničeskogo Universiteta: Tehničeskie Nauki system approach seismic hazard seismic risk elements vulnerability seismic risk acceptable risk seismic risk reduction |
author_facet |
A. D. Abakarov I. B. Kurbanov |
author_sort |
A. D. Abakarov |
title |
METHODOLOGY OF SYSTEM APPROACHE TO SEISMIC RISK ASSESSMENT AND REDUCTION |
title_short |
METHODOLOGY OF SYSTEM APPROACHE TO SEISMIC RISK ASSESSMENT AND REDUCTION |
title_full |
METHODOLOGY OF SYSTEM APPROACHE TO SEISMIC RISK ASSESSMENT AND REDUCTION |
title_fullStr |
METHODOLOGY OF SYSTEM APPROACHE TO SEISMIC RISK ASSESSMENT AND REDUCTION |
title_full_unstemmed |
METHODOLOGY OF SYSTEM APPROACHE TO SEISMIC RISK ASSESSMENT AND REDUCTION |
title_sort |
methodology of system approache to seismic risk assessment and reduction |
publisher |
Daghestan State Technical University |
series |
Vestnik Dagestanskogo Gosudarstvennogo Tehničeskogo Universiteta: Tehničeskie Nauki |
issn |
2073-6185 2542-095X |
publishDate |
2016-07-01 |
description |
Abstract. Ensuring of urban areas seismic safety is a task which do not require delay. But it cannot be solved by separate parts. It is essential that all components of the seismic hazard must be grouped together in one problem based on the system approach. In the present paper is presented not only the main flowchart of systems approach to ensuring the territory seismic safety but also the flowcharts of components of each main unit. They cover the whole package of measures for a full assessment of territory seismic hazard, seismic risk and its reduction.The proposed methodology can be carried out for design and implementation of regional territory seismic safety programs. |
topic |
system approach seismic hazard seismic risk elements vulnerability seismic risk acceptable risk seismic risk reduction |
url |
https://vestnik.dgtu.ru/jour/article/view/121 |
work_keys_str_mv |
AT adabakarov methodologyofsystemapproachetoseismicriskassessmentandreduction AT ibkurbanov methodologyofsystemapproachetoseismicriskassessmentandreduction |
_version_ |
1721264785999265792 |