Capacity planning in operations producing heavy plate cut shapes

The present approach to capacity planning in operations producing heavy metal shapes causes problems in fulfilling the required financial and volume indexes in production, as well as in meeting the work order completion dates. The article represents the methodology for optimal production scheduling...

Full description

Bibliographic Details
Main Authors: R. Lenort, D. Staš, A. Samolejová
Format: Article
Language:English
Published: Croatian Metallurgical Society 2009-07-01
Series:Metalurgija
Subjects:
Online Access:http://public.carnet.hr/metalurg/Metalurgija/2009_vol_48/No_3/MET_48_3_209_211_Lenort.pdf
id doaj-1234a70eae8c4c38bc2503f4ba647ac4
record_format Article
spelling doaj-1234a70eae8c4c38bc2503f4ba647ac42020-11-24T23:15:01ZengCroatian Metallurgical SocietyMetalurgija0543-58461334-25762009-07-01483209211Capacity planning in operations producing heavy plate cut shapesR. LenortD. StašA. SamolejováThe present approach to capacity planning in operations producing heavy metal shapes causes problems in fulfilling the required financial and volume indexes in production, as well as in meeting the work order completion dates. The article represents the methodology for optimal production scheduling in operations producing heavy plate cut shapes, which significantly eliminates the above-mentioned problems. The methodology is based on the application Generalized Assignment Problem (GAP).http://public.carnet.hr/metalurg/Metalurgija/2009_vol_48/No_3/MET_48_3_209_211_Lenort.pdfcapacity planningproduction of heavy plate cut shapesproduction schedulingoptimizationGeneralized Assignment Problem (GAP)
collection DOAJ
language English
format Article
sources DOAJ
author R. Lenort
D. Staš
A. Samolejová
spellingShingle R. Lenort
D. Staš
A. Samolejová
Capacity planning in operations producing heavy plate cut shapes
Metalurgija
capacity planning
production of heavy plate cut shapes
production scheduling
optimization
Generalized Assignment Problem (GAP)
author_facet R. Lenort
D. Staš
A. Samolejová
author_sort R. Lenort
title Capacity planning in operations producing heavy plate cut shapes
title_short Capacity planning in operations producing heavy plate cut shapes
title_full Capacity planning in operations producing heavy plate cut shapes
title_fullStr Capacity planning in operations producing heavy plate cut shapes
title_full_unstemmed Capacity planning in operations producing heavy plate cut shapes
title_sort capacity planning in operations producing heavy plate cut shapes
publisher Croatian Metallurgical Society
series Metalurgija
issn 0543-5846
1334-2576
publishDate 2009-07-01
description The present approach to capacity planning in operations producing heavy metal shapes causes problems in fulfilling the required financial and volume indexes in production, as well as in meeting the work order completion dates. The article represents the methodology for optimal production scheduling in operations producing heavy plate cut shapes, which significantly eliminates the above-mentioned problems. The methodology is based on the application Generalized Assignment Problem (GAP).
topic capacity planning
production of heavy plate cut shapes
production scheduling
optimization
Generalized Assignment Problem (GAP)
url http://public.carnet.hr/metalurg/Metalurgija/2009_vol_48/No_3/MET_48_3_209_211_Lenort.pdf
work_keys_str_mv AT rlenort capacityplanninginoperationsproducingheavyplatecutshapes
AT dstas capacityplanninginoperationsproducingheavyplatecutshapes
AT asamolejova capacityplanninginoperationsproducingheavyplatecutshapes
_version_ 1725592322440167424