Ground subsidence due to the backfill pressure in tunnel boring machine
<p>In shield tunnel boring machine constructions, backfill pressure affects surface settlement and the stability of other underground structures nearby. Therefore, it is essential to pre-calculate backfill pressure in the design stage. This study examines and compares the seven internationally...
Main Authors: | C.-K. Ahn, S.-W. Lee |
---|---|
Format: | Article |
Language: | English |
Published: |
Copernicus Publications
2020-04-01
|
Series: | Proceedings of the International Association of Hydrological Sciences |
Online Access: | https://www.proc-iahs.net/382/19/2020/piahs-382-19-2020.pdf |
Similar Items
-
Monitoring and Analysis of Ground Settlement Induced by Tunnelling with Slurry Pressure-Balanced Tunnel Boring Machine
by: Hyunku Park, et al.
Published: (2018-01-01) -
The Reliability of a Tunnel Boring Machine
by: Mohammad Javad Jafari, et al.
Published: (2009-07-01) -
The Reliability of a Tunnel Boring Machine
by: Hamid Reza Sheikhi, et al.
Published: (2009-04-01) -
Dispersant for Reducing Mud Cakes of Slurry Shield Tunnel Boring Machine in Sticky Ground
by: Shisen Zhao, et al.
Published: (2021-01-01) -
Ground settlement induced by tunnel boring in stiff clay
by: Davor Milaković, et al.
Published: (2014-07-01)