Origin – cause matrix: a practical approach for identification of waste associated with variation orders

This article has a two-fold aim, namely of reviewing the literature pertaining to waste associated with variation orders and providing a tool for identification of waste zones arising from a variation order. Literature was reviewed about the administration and waste associated with variation orders....

Full description

Bibliographic Details
Main Authors: Ruben Ndihokubwayo, Theo Haupt
Format: Article
Language:English
Published: University of the Free State 2008-12-01
Series:Acta Structilia
Subjects:
Online Access:http://journals.ufs.ac.za/index.php/as/article/view/185
id doaj-11d30bbb73be4b35bada27a3cf262657
record_format Article
spelling doaj-11d30bbb73be4b35bada27a3cf2626572020-11-24T20:57:13ZengUniversity of the Free StateActa Structilia1023-05642415-04872008-12-01152126142Origin – cause matrix: a practical approach for identification of waste associated with variation ordersRuben Ndihokubwayo0Theo Haupt1Cape Peninsula University of TechnologyCape Peninsula University of TechnologyThis article has a two-fold aim, namely of reviewing the literature pertaining to waste associated with variation orders and providing a tool for identification of waste zones arising from a variation order. Literature was reviewed about the administration and waste associated with variation orders. Two case studies for the purpose of the study consisted of completed apartment complexes in Cape Town. Variation orders on the respective projects were grouped by number and value in an origin-cause table. The literature review confirmed the likelihood of waste of resources following the occurrence of variation orders. Arguably, the excessive occurrence of variation orders was among factors that contributed to overall higher construction delivery costs and time overruns. By auditing each variation order in terms of the value, origin agent and the cause, it was possible to identify some project aspects that yielded waste of resources. Typically, these were the cost of errors originating from the consultant and the client. The origin-cause matrix could be a tool to provide a breakdown of the probable magnitude of waste associated with variation orders. The study was confined to a limited number of apartment-type construction projects to provide insight into the potential impact of variation orders on project performance. The origin-cause matrix could be a practical tool used to track construction project activities that yield waste. The topic discusses issues that have not been widely covered by previous research studies. The origin-cause matrix was designed as a tool for identification of waste based on a theory of waste formation.http://journals.ufs.ac.za/index.php/as/article/view/185CausesNon value-addingOrigin agentsVariation ordersWaste
collection DOAJ
language English
format Article
sources DOAJ
author Ruben Ndihokubwayo
Theo Haupt
spellingShingle Ruben Ndihokubwayo
Theo Haupt
Origin – cause matrix: a practical approach for identification of waste associated with variation orders
Acta Structilia
Causes
Non value-adding
Origin agents
Variation orders
Waste
author_facet Ruben Ndihokubwayo
Theo Haupt
author_sort Ruben Ndihokubwayo
title Origin – cause matrix: a practical approach for identification of waste associated with variation orders
title_short Origin – cause matrix: a practical approach for identification of waste associated with variation orders
title_full Origin – cause matrix: a practical approach for identification of waste associated with variation orders
title_fullStr Origin – cause matrix: a practical approach for identification of waste associated with variation orders
title_full_unstemmed Origin – cause matrix: a practical approach for identification of waste associated with variation orders
title_sort origin – cause matrix: a practical approach for identification of waste associated with variation orders
publisher University of the Free State
series Acta Structilia
issn 1023-0564
2415-0487
publishDate 2008-12-01
description This article has a two-fold aim, namely of reviewing the literature pertaining to waste associated with variation orders and providing a tool for identification of waste zones arising from a variation order. Literature was reviewed about the administration and waste associated with variation orders. Two case studies for the purpose of the study consisted of completed apartment complexes in Cape Town. Variation orders on the respective projects were grouped by number and value in an origin-cause table. The literature review confirmed the likelihood of waste of resources following the occurrence of variation orders. Arguably, the excessive occurrence of variation orders was among factors that contributed to overall higher construction delivery costs and time overruns. By auditing each variation order in terms of the value, origin agent and the cause, it was possible to identify some project aspects that yielded waste of resources. Typically, these were the cost of errors originating from the consultant and the client. The origin-cause matrix could be a tool to provide a breakdown of the probable magnitude of waste associated with variation orders. The study was confined to a limited number of apartment-type construction projects to provide insight into the potential impact of variation orders on project performance. The origin-cause matrix could be a practical tool used to track construction project activities that yield waste. The topic discusses issues that have not been widely covered by previous research studies. The origin-cause matrix was designed as a tool for identification of waste based on a theory of waste formation.
topic Causes
Non value-adding
Origin agents
Variation orders
Waste
url http://journals.ufs.ac.za/index.php/as/article/view/185
work_keys_str_mv AT rubenndihokubwayo origincausematrixapracticalapproachforidentificationofwasteassociatedwithvariationorders
AT theohaupt origincausematrixapracticalapproachforidentificationofwasteassociatedwithvariationorders
_version_ 1716788466782568448