Design and Construction of the Circular Shape Shaft Using the Reverse Construction Method
Restricted by the environment and the city’s planning, some pipe jacking used for the HV cable tunnel have to pass through some roads which has been build. Different kind of equipment has certain applicability in the pipe jacking construction procedure, especially with the geological condition, and...
Main Author: | Tang Ziqiang |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2020-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/58/e3sconf_isceg2020_02011.pdf |
Similar Items
-
Simultaneous Operations of Pregrouting and Shaft Drilling in Shaft Construction
by: Zhipeng Xu, et al.
Published: (2020-01-01) -
Virtual Simulations of a New Construction of the Artificial Shaft Bottom (Shaft Safety Platform) for Use in Mine Shafts
by: Paweł Kamiński, et al.
Published: (2021-04-01) -
Constructing Circular Design Process Using Sociological Theory
by: Chun,Tseng Kuo, et al.
Published: (2017) -
Construction Effects on the Side Shear of Drilled Shafts
by: Caliari De Lima, Lucas
Published: (2017) -
BEHAVIOR OF UNDERGROUND LINED CIRCULAR SHAFTS
by: Almadhoun, Ibrahim Hasan
Published: (1981)