Manufacturing optimization using Tsukamoto fuzzy inference system method: A case study in block paving and solid concrete block industry

Fuzzy method has advantages in solving real-world problems that are mostly non-binary and non-linear, such as calculating the optimization of production quantities. A case study for the application of this method was applied in UD. Setia Kawan Company that run the production of solid concrete and bl...

Full description

Bibliographic Details
Main Authors: Sayuti M, Juliananda, Sofyan Diana Khairani
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201820402002
id doaj-0fbe852644a648e5afcdeaa60332114b
record_format Article
spelling doaj-0fbe852644a648e5afcdeaa60332114b2021-02-02T08:08:08ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-012040200210.1051/matecconf/201820402002matecconf_imiec2018_02002Manufacturing optimization using Tsukamoto fuzzy inference system method: A case study in block paving and solid concrete block industrySayuti MJulianandaSofyan Diana KhairaniFuzzy method has advantages in solving real-world problems that are mostly non-binary and non-linear, such as calculating the optimization of production quantities. A case study for the application of this method was applied in UD. Setia Kawan Company that run the production of solid concrete and block paving. The problems faced by this company is the high demand for products resulting in short stock and sometimes over stock due to unstable customer ordering and inaccurate management in production planning. From the calculations, the number of solid concrete block produced by the company on the period of October 2016, December 2016 and February 2017 was not optimal. According to Tsukamoto’s FIS, the optimal number of solid concrete block in the third period is 9973, 9562 and 12.087 unit of solid concrete block. While the number of block paving produced by the company on the period of November 2016, December 2016 and January 2017 was also not optimal. According to Tsukamoto’s FIS analysis, the optimal number of block paving in the third period should be 9.116, 10.113 and 7.120 unit of block pavinghttps://doi.org/10.1051/matecconf/201820402002
collection DOAJ
language English
format Article
sources DOAJ
author Sayuti M
Juliananda
Sofyan Diana Khairani
spellingShingle Sayuti M
Juliananda
Sofyan Diana Khairani
Manufacturing optimization using Tsukamoto fuzzy inference system method: A case study in block paving and solid concrete block industry
MATEC Web of Conferences
author_facet Sayuti M
Juliananda
Sofyan Diana Khairani
author_sort Sayuti M
title Manufacturing optimization using Tsukamoto fuzzy inference system method: A case study in block paving and solid concrete block industry
title_short Manufacturing optimization using Tsukamoto fuzzy inference system method: A case study in block paving and solid concrete block industry
title_full Manufacturing optimization using Tsukamoto fuzzy inference system method: A case study in block paving and solid concrete block industry
title_fullStr Manufacturing optimization using Tsukamoto fuzzy inference system method: A case study in block paving and solid concrete block industry
title_full_unstemmed Manufacturing optimization using Tsukamoto fuzzy inference system method: A case study in block paving and solid concrete block industry
title_sort manufacturing optimization using tsukamoto fuzzy inference system method: a case study in block paving and solid concrete block industry
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2018-01-01
description Fuzzy method has advantages in solving real-world problems that are mostly non-binary and non-linear, such as calculating the optimization of production quantities. A case study for the application of this method was applied in UD. Setia Kawan Company that run the production of solid concrete and block paving. The problems faced by this company is the high demand for products resulting in short stock and sometimes over stock due to unstable customer ordering and inaccurate management in production planning. From the calculations, the number of solid concrete block produced by the company on the period of October 2016, December 2016 and February 2017 was not optimal. According to Tsukamoto’s FIS, the optimal number of solid concrete block in the third period is 9973, 9562 and 12.087 unit of solid concrete block. While the number of block paving produced by the company on the period of November 2016, December 2016 and January 2017 was also not optimal. According to Tsukamoto’s FIS analysis, the optimal number of block paving in the third period should be 9.116, 10.113 and 7.120 unit of block paving
url https://doi.org/10.1051/matecconf/201820402002
work_keys_str_mv AT sayutim manufacturingoptimizationusingtsukamotofuzzyinferencesystemmethodacasestudyinblockpavingandsolidconcreteblockindustry
AT juliananda manufacturingoptimizationusingtsukamotofuzzyinferencesystemmethodacasestudyinblockpavingandsolidconcreteblockindustry
AT sofyandianakhairani manufacturingoptimizationusingtsukamotofuzzyinferencesystemmethodacasestudyinblockpavingandsolidconcreteblockindustry
_version_ 1724297763711090688