Problems concerning reconstruction of old postindustrial building of a closed coal mine and its adaptation to a new utility function

The waiting room and bath building is one of the two preserved industrial facilities of the former Gliwice Mine. It was built in the first years of the 20th century and fulfilled its function till mine liquidation in 2000. It was overhauled and modernized in 2005-2008 and currently fulfills a new fu...

Full description

Bibliographic Details
Main Authors: Hulimka Jacek, Kubica Jan, Kałuża Marta
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201817403021
id doaj-0ee67e16fac14bf285612d12c5bf94b3
record_format Article
spelling doaj-0ee67e16fac14bf285612d12c5bf94b32021-02-02T07:50:14ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-011740302110.1051/matecconf/201817403021matecconf_ecce2018_03021Problems concerning reconstruction of old postindustrial building of a closed coal mine and its adaptation to a new utility functionHulimka JacekKubica JanKałuża MartaThe waiting room and bath building is one of the two preserved industrial facilities of the former Gliwice Mine. It was built in the first years of the 20th century and fulfilled its function till mine liquidation in 2000. It was overhauled and modernized in 2005-2008 and currently fulfills a new function. The paper presents a summarized history of the Gliwice Mine, a detailed description of the building structure, its technical condition before the overhaul and problems encountered during the adaptation works. It also briefly indicates the causes of the observed damage as well as describes the scope of the basic modernization works related to the new function of the building as an education and office facility. Moreover, it presents the manner of conducting the overhaul and modernization works leading to restoration of the full utility values in the new function.https://doi.org/10.1051/matecconf/201817403021
collection DOAJ
language English
format Article
sources DOAJ
author Hulimka Jacek
Kubica Jan
Kałuża Marta
spellingShingle Hulimka Jacek
Kubica Jan
Kałuża Marta
Problems concerning reconstruction of old postindustrial building of a closed coal mine and its adaptation to a new utility function
MATEC Web of Conferences
author_facet Hulimka Jacek
Kubica Jan
Kałuża Marta
author_sort Hulimka Jacek
title Problems concerning reconstruction of old postindustrial building of a closed coal mine and its adaptation to a new utility function
title_short Problems concerning reconstruction of old postindustrial building of a closed coal mine and its adaptation to a new utility function
title_full Problems concerning reconstruction of old postindustrial building of a closed coal mine and its adaptation to a new utility function
title_fullStr Problems concerning reconstruction of old postindustrial building of a closed coal mine and its adaptation to a new utility function
title_full_unstemmed Problems concerning reconstruction of old postindustrial building of a closed coal mine and its adaptation to a new utility function
title_sort problems concerning reconstruction of old postindustrial building of a closed coal mine and its adaptation to a new utility function
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2018-01-01
description The waiting room and bath building is one of the two preserved industrial facilities of the former Gliwice Mine. It was built in the first years of the 20th century and fulfilled its function till mine liquidation in 2000. It was overhauled and modernized in 2005-2008 and currently fulfills a new function. The paper presents a summarized history of the Gliwice Mine, a detailed description of the building structure, its technical condition before the overhaul and problems encountered during the adaptation works. It also briefly indicates the causes of the observed damage as well as describes the scope of the basic modernization works related to the new function of the building as an education and office facility. Moreover, it presents the manner of conducting the overhaul and modernization works leading to restoration of the full utility values in the new function.
url https://doi.org/10.1051/matecconf/201817403021
work_keys_str_mv AT hulimkajacek problemsconcerningreconstructionofoldpostindustrialbuildingofaclosedcoalmineanditsadaptationtoanewutilityfunction
AT kubicajan problemsconcerningreconstructionofoldpostindustrialbuildingofaclosedcoalmineanditsadaptationtoanewutilityfunction
AT kałuzamarta problemsconcerningreconstructionofoldpostindustrialbuildingofaclosedcoalmineanditsadaptationtoanewutilityfunction
_version_ 1724298494185832448