Stability Analysis of Shallow and Bias Loess Tunnel Based on Finite Difference Method
Based on the Mohr-Coulomb elastic-plastic model and the practical engineering background of Mopanshan tunnel, this paper applies the finite-difference software FLAC3D to simulate and analyse the whole process of loess tunnel construction. Then, it analyses the stability of the surrounding rock and s...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/57/e3sconf_chinabiofilms18_01027.pdf |
id |
doaj-0eaf1e1bb9f146ec9ab778ff1515ddfd |
---|---|
record_format |
Article |
spelling |
doaj-0eaf1e1bb9f146ec9ab778ff1515ddfd2021-02-02T07:51:47ZengEDP SciencesE3S Web of Conferences2267-12422019-01-011310102710.1051/e3sconf/201913101027e3sconf_chinabiofilms18_01027Stability Analysis of Shallow and Bias Loess Tunnel Based on Finite Difference MethodYongbing Li0Li Binglei1Hua Guanyu2Jia Xinran3Chen Yanqiao4Zhang Tanzeng5College of Safety Engineering, Henan University of EngineeringCollege of Zijin Mining, Fuzhou UniversityCollege of Safety Engineering, Henan University of EngineeringCollege of Safety Engineering, Henan University of EngineeringCollege of Safety Engineering, Henan University of EngineeringCollege of Safety Engineering, Henan University of EngineeringBased on the Mohr-Coulomb elastic-plastic model and the practical engineering background of Mopanshan tunnel, this paper applies the finite-difference software FLAC3D to simulate and analyse the whole process of loess tunnel construction. Then, it analyses the stability of the surrounding rock and sup-port structure after partial excavation of the loess tunnel under the shallow burying and unsymmetrical load-ing condition. The study showed that in the absence of support, the shear failure occurred to the top/upper pilot tunnel of the tunnel face, the failure zone under tensile stress happened to the shallow soil of the earth surface, and the soil of tunnel face appeared to be damaged. Finally, according to the analysis results, a rea-sonable construction method suitable for the shallow and bias loess tunnel is determined.https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/57/e3sconf_chinabiofilms18_01027.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Yongbing Li Li Binglei Hua Guanyu Jia Xinran Chen Yanqiao Zhang Tanzeng |
spellingShingle |
Yongbing Li Li Binglei Hua Guanyu Jia Xinran Chen Yanqiao Zhang Tanzeng Stability Analysis of Shallow and Bias Loess Tunnel Based on Finite Difference Method E3S Web of Conferences |
author_facet |
Yongbing Li Li Binglei Hua Guanyu Jia Xinran Chen Yanqiao Zhang Tanzeng |
author_sort |
Yongbing Li |
title |
Stability Analysis of Shallow and Bias Loess Tunnel Based on Finite Difference Method |
title_short |
Stability Analysis of Shallow and Bias Loess Tunnel Based on Finite Difference Method |
title_full |
Stability Analysis of Shallow and Bias Loess Tunnel Based on Finite Difference Method |
title_fullStr |
Stability Analysis of Shallow and Bias Loess Tunnel Based on Finite Difference Method |
title_full_unstemmed |
Stability Analysis of Shallow and Bias Loess Tunnel Based on Finite Difference Method |
title_sort |
stability analysis of shallow and bias loess tunnel based on finite difference method |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2019-01-01 |
description |
Based on the Mohr-Coulomb elastic-plastic model and the practical engineering background of Mopanshan tunnel, this paper applies the finite-difference software FLAC3D to simulate and analyse the whole process of loess tunnel construction. Then, it analyses the stability of the surrounding rock and sup-port structure after partial excavation of the loess tunnel under the shallow burying and unsymmetrical load-ing condition. The study showed that in the absence of support, the shear failure occurred to the top/upper pilot tunnel of the tunnel face, the failure zone under tensile stress happened to the shallow soil of the earth surface, and the soil of tunnel face appeared to be damaged. Finally, according to the analysis results, a rea-sonable construction method suitable for the shallow and bias loess tunnel is determined. |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/57/e3sconf_chinabiofilms18_01027.pdf |
work_keys_str_mv |
AT yongbingli stabilityanalysisofshallowandbiasloesstunnelbasedonfinitedifferencemethod AT libinglei stabilityanalysisofshallowandbiasloesstunnelbasedonfinitedifferencemethod AT huaguanyu stabilityanalysisofshallowandbiasloesstunnelbasedonfinitedifferencemethod AT jiaxinran stabilityanalysisofshallowandbiasloesstunnelbasedonfinitedifferencemethod AT chenyanqiao stabilityanalysisofshallowandbiasloesstunnelbasedonfinitedifferencemethod AT zhangtanzeng stabilityanalysisofshallowandbiasloesstunnelbasedonfinitedifferencemethod |
_version_ |
1724298373233639424 |