Developing a new technique for the simultaneous optimization of both segmented time and injection rate for water flooding reservoirs: An analysis of Shengli Oilfield XIN-42 reservoir block
The adjustment and control of the water injection rate is a commonly used method for increasing the cumulative oil production of waterflooded reservoirs. This article studies the production optimization problem under the condition of a fixed total water injection rate. The production process is divi...