Modified Multi-Crossover Operator NSGA-III for Solving Low Carbon Flexible Job Shop Scheduling Problem
Low carbon manufacturing has received increasingly more attention in the context of global warming. The flexible job shop scheduling problem (FJSP) widely exists in various manufacturing processes. Researchers have always emphasized manufacturing efficiency and economic benefits while ignoring envir...
Main Authors: | Xingping Sun, Ye Wang, Hongwei Kang, Yong Shen, Qingyi Chen, Da Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-12-01
|
Series: | Processes |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-9717/9/1/62 |
Similar Items
-
A Modified Genetic Algorithm with Local Search Strategies and Multi-Crossover Operator for Job Shop Scheduling Problem
by: Monique Simplicio Viana, et al.
Published: (2020-09-01) -
Flexible job-shop scheduling with learning and forgetting effect by Multi-Agent System
by: Paolo Renna
Published: (2019-05-01) -
Study on multi-objective flexible job-shop scheduling problem considering energy consumption
by: Zengqiang Jiang, et al.
Published: (2014-06-01) -
Parallelism and Hybridization in Differential Evolution to solve the Flexible Job Shop Scheduling Problem
by: Carolina Salto, et al.
Published: (2020-05-01) -
An Adaptive Multi-Objective Evolutionary Algorithm with Two-Stage Local Search for Flexible Job-Shop Scheduling
by: Yingli Li, et al.
Published: (2020-11-01)