Use of probabilistic and statistical methods for determination of the sources of water flow in candidate wells for water shut-off works (on example of the Visean reservoir of the Perm region field)

Today, the problem of production of surplus associated water is particularly actual because of transition of fields to the final stages of development. Water shut-off works are the main method to combat the increased water cut of wells of modern fields. One of the most important stages in water shut...

Full description

Bibliographic Details
Main Author: Darya A. Kudryashova
Format: Article
Language:English
Published: Perm National Research Polytechnic University 2018-03-01
Series:Perm Journal of Petroleum and Mining Engineering
Subjects:
Online Access:http://vestnik.pstu.ru/get/_res/fs/file2.pdf/7422/Use+of+probabilistic+and+statistical+methods+for+determination+of+the+sources+of+water+flow+in+candidate+wells+for+water+shut-off+works+%28on+example+of+the+Visean+reservoir+of+the+Perm+region+field%29file2.pdf
id doaj-0cac2ec9b7474b6391352e1da94b1a55
record_format Article
spelling doaj-0cac2ec9b7474b6391352e1da94b1a552020-11-24T21:19:10ZengPerm National Research Polytechnic UniversityPerm Journal of Petroleum and Mining Engineering2224-99232305-11402018-03-01171263610.15593/2224-9923/2018.1.3Use of probabilistic and statistical methods for determination of the sources of water flow in candidate wells for water shut-off works (on example of the Visean reservoir of the Perm region field)Darya A. Kudryashova0Perm National Research Polytechnic UniversityToday, the problem of production of surplus associated water is particularly actual because of transition of fields to the final stages of development. Water shut-off works are the main method to combat the increased water cut of wells of modern fields. One of the most important stages in water shut-off works is the selection of candidate wells and determination of their sources of water inflow which depend on the geological structure of an oil reservoir and well technical state. Technical reasons of water inflow to wells include leakage of a production string and annular circulation. Geological reasons include lift of water-oil contact to the bottom hole, breakthrough of water along the productive formation, fractures between wells or formations. The article discusses production wells of the Visean reservoir of the Perm region field with shut-off works done. Wells are divided according to the most common sources of water inflow into two groups such as a breakthrough in the productive formation of pumped or aquifer water. To analyze the average values of geological and technological parameters of the two groups of wells obtained from the field data the Student's t-criterion is used. Among the analyzed parameters the distance from the lower perforation to the water-oil contact, formation thickness and thickness of the interval of water inflow are statistically significant. To determine the sources of water inflow for 19 candidate wells of the Visean reservoir of the Perm region field a discriminant analysis is performed. Based on the table of values of a posteriori probabilities, it is revealed that 4 wells of 19 candidate wells for water shut-off works are flooded due to breakthroughs of pumped water through the productive formation, 4 wells are flooded by aquifer water. The 11 remaining candidate wells are likely to have another source of water.http://vestnik.pstu.ru/get/_res/fs/file2.pdf/7422/Use+of+probabilistic+and+statistical+methods+for+determination+of+the+sources+of+water+flow+in+candidate+wells+for+water+shut-off+works+%28on+example+of+the+Visean+reservoir+of+the+Perm+region+field%29file2.pdfVisean reservoirwellwatercutwater shut-off workssource of water inflowwater breakthrough along the productive formationpumped wateraquifer waterStudent’s t-criteriondistance from the lower perforation object to the water-oil contactthickness of water inflow intervalcurrent density of water produceddiscriminant analysisWilks' Lambdaclassification functionposteriori probability
collection DOAJ
language English
format Article
sources DOAJ
author Darya A. Kudryashova
spellingShingle Darya A. Kudryashova
Use of probabilistic and statistical methods for determination of the sources of water flow in candidate wells for water shut-off works (on example of the Visean reservoir of the Perm region field)
Perm Journal of Petroleum and Mining Engineering
Visean reservoir
well
watercut
water shut-off works
source of water inflow
water breakthrough along the productive formation
pumped water
aquifer water
Student’s t-criterion
distance from the lower perforation object to the water-oil contact
thickness of water inflow interval
current density of water produced
discriminant analysis
Wilks' Lambda
classification function
posteriori probability
author_facet Darya A. Kudryashova
author_sort Darya A. Kudryashova
title Use of probabilistic and statistical methods for determination of the sources of water flow in candidate wells for water shut-off works (on example of the Visean reservoir of the Perm region field)
title_short Use of probabilistic and statistical methods for determination of the sources of water flow in candidate wells for water shut-off works (on example of the Visean reservoir of the Perm region field)
title_full Use of probabilistic and statistical methods for determination of the sources of water flow in candidate wells for water shut-off works (on example of the Visean reservoir of the Perm region field)
title_fullStr Use of probabilistic and statistical methods for determination of the sources of water flow in candidate wells for water shut-off works (on example of the Visean reservoir of the Perm region field)
title_full_unstemmed Use of probabilistic and statistical methods for determination of the sources of water flow in candidate wells for water shut-off works (on example of the Visean reservoir of the Perm region field)
title_sort use of probabilistic and statistical methods for determination of the sources of water flow in candidate wells for water shut-off works (on example of the visean reservoir of the perm region field)
publisher Perm National Research Polytechnic University
series Perm Journal of Petroleum and Mining Engineering
issn 2224-9923
2305-1140
publishDate 2018-03-01
description Today, the problem of production of surplus associated water is particularly actual because of transition of fields to the final stages of development. Water shut-off works are the main method to combat the increased water cut of wells of modern fields. One of the most important stages in water shut-off works is the selection of candidate wells and determination of their sources of water inflow which depend on the geological structure of an oil reservoir and well technical state. Technical reasons of water inflow to wells include leakage of a production string and annular circulation. Geological reasons include lift of water-oil contact to the bottom hole, breakthrough of water along the productive formation, fractures between wells or formations. The article discusses production wells of the Visean reservoir of the Perm region field with shut-off works done. Wells are divided according to the most common sources of water inflow into two groups such as a breakthrough in the productive formation of pumped or aquifer water. To analyze the average values of geological and technological parameters of the two groups of wells obtained from the field data the Student's t-criterion is used. Among the analyzed parameters the distance from the lower perforation to the water-oil contact, formation thickness and thickness of the interval of water inflow are statistically significant. To determine the sources of water inflow for 19 candidate wells of the Visean reservoir of the Perm region field a discriminant analysis is performed. Based on the table of values of a posteriori probabilities, it is revealed that 4 wells of 19 candidate wells for water shut-off works are flooded due to breakthroughs of pumped water through the productive formation, 4 wells are flooded by aquifer water. The 11 remaining candidate wells are likely to have another source of water.
topic Visean reservoir
well
watercut
water shut-off works
source of water inflow
water breakthrough along the productive formation
pumped water
aquifer water
Student’s t-criterion
distance from the lower perforation object to the water-oil contact
thickness of water inflow interval
current density of water produced
discriminant analysis
Wilks' Lambda
classification function
posteriori probability
url http://vestnik.pstu.ru/get/_res/fs/file2.pdf/7422/Use+of+probabilistic+and+statistical+methods+for+determination+of+the+sources+of+water+flow+in+candidate+wells+for+water+shut-off+works+%28on+example+of+the+Visean+reservoir+of+the+Perm+region+field%29file2.pdf
work_keys_str_mv AT daryaakudryashova useofprobabilisticandstatisticalmethodsfordeterminationofthesourcesofwaterflowincandidatewellsforwatershutoffworksonexampleoftheviseanreservoirofthepermregionfield
_version_ 1726006642763366400