Building enterprises industrial structure's optimisation/Statybos įmonių gamybinės struktūros optimizavimas
Building enterprises industrial programme which is muolded by the way of competition, could hesitate in rather wide limits: in its quantity and expenditure of labour structure. It is possible to expect high results of activity only then, if building enterprises would be able to adjust properly...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Vilnius Gediminas Technical University
1996-03-01
|
Series: | Journal of Civil Engineering and Management |
Subjects: | |
Online Access: | http://journals.vgtu.lt/index.php/JCEM/article/view/9554 |
id |
doaj-0c57280ef3304f92b10f74abf87b5da4 |
---|---|
record_format |
Article |
spelling |
doaj-0c57280ef3304f92b10f74abf87b5da42021-07-02T03:41:55ZengVilnius Gediminas Technical UniversityJournal of Civil Engineering and Management1392-37301822-36051996-03-012510.3846/13921525.1996.10531551Building enterprises industrial structure's optimisation/Statybos įmonių gamybinės struktūros optimizavimasR. GinevičiusS. Čirba Building enterprises industrial programme which is muolded by the way of competition, could hesitate in rather wide limits: in its quantity and expenditure of labour structure. It is possible to expect high results of activity only then, if building enterprises would be able to adjust properly near changeable environment. You could do this only if you reorganisate its industrial structure. Two sides could be responsible for this formation-constant and changeable. The first side must ensure enterprises potential, the high works quantity and paces. The second one must compensate industrial programme scale and structures hesitation. If you want to find awarded parts quantity you must solve optimisation problem it means to define what volume of works during the analysing period must do its “nucleus” units that the recieved profit would be the greatest one. First Published Online: 26 Jul 2012 http://journals.vgtu.lt/index.php/JCEM/article/view/9554- |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
R. Ginevičius S. Čirba |
spellingShingle |
R. Ginevičius S. Čirba Building enterprises industrial structure's optimisation/Statybos įmonių gamybinės struktūros optimizavimas Journal of Civil Engineering and Management - |
author_facet |
R. Ginevičius S. Čirba |
author_sort |
R. Ginevičius |
title |
Building enterprises industrial structure's optimisation/Statybos įmonių gamybinės struktūros optimizavimas |
title_short |
Building enterprises industrial structure's optimisation/Statybos įmonių gamybinės struktūros optimizavimas |
title_full |
Building enterprises industrial structure's optimisation/Statybos įmonių gamybinės struktūros optimizavimas |
title_fullStr |
Building enterprises industrial structure's optimisation/Statybos įmonių gamybinės struktūros optimizavimas |
title_full_unstemmed |
Building enterprises industrial structure's optimisation/Statybos įmonių gamybinės struktūros optimizavimas |
title_sort |
building enterprises industrial structure's optimisation/statybos įmonių gamybinės struktūros optimizavimas |
publisher |
Vilnius Gediminas Technical University |
series |
Journal of Civil Engineering and Management |
issn |
1392-3730 1822-3605 |
publishDate |
1996-03-01 |
description |
Building enterprises industrial programme which is muolded by the way of competition, could hesitate in rather wide limits: in its quantity and expenditure of labour structure. It is possible to expect high results of activity only then, if building enterprises would be able to adjust properly near changeable environment. You could do this only if you reorganisate its industrial structure. Two sides could be responsible for this formation-constant and changeable. The first side must ensure enterprises potential, the high works quantity and paces. The second one must compensate industrial programme scale and structures hesitation. If you want to find awarded parts quantity you must solve optimisation problem it means to define what volume of works during the analysing period must do its “nucleus” units that the recieved profit would be the greatest one.
First Published Online: 26 Jul 2012
|
topic |
- |
url |
http://journals.vgtu.lt/index.php/JCEM/article/view/9554 |
work_keys_str_mv |
AT rginevicius buildingenterprisesindustrialstructuresoptimisationstatybosimoniugamybinesstrukturosoptimizavimas AT scirba buildingenterprisesindustrialstructuresoptimisationstatybosimoniugamybinesstrukturosoptimizavimas |
_version_ |
1721341214706368512 |