Complex Testing of the Bridges
This article describes the process of examining bridges. AB road bridge, founded on the columns by the Karpoš system and damaged due to erosive action of the river, is given as an example. The first tests of the bridge are conducted on the impact load of V 300, because of the appearance of longitudi...
Main Author: | Savić Adrijana |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2016-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | http://dx.doi.org/10.1051/matecconf/20165301030 |
Similar Items
-
Bridges to consciousness : complexes and complexity
by: Krieger, N. M.
Published: (2013) -
Heterobimetallic dicyclohexylphosphido-bridged complexes
by: Jenkins, Hilary Anne
Published: (2013) -
The chemistry of ligand bridged complexes
by: Caffyn, Andrew James Morris
Published: (1989) -
Heterobimetallic dicyclohexylphosphido-bridged complexes
by: Jenkins, Hilary Anne
Published: (2013) -
Load testing of Highway Bridge
by: Bujňáková Petra, et al.
Published: (2018-01-01)