Design of Groundwater Extraction in Open Cut Foundation Pit and Simplified Calculation of Ground Subsidence due to Dewatering in Sandy Pebble Soil Strata
In order to study the design of incomplete well point for groundwater extraction in open cut foundation pit in which the inner and outer aquifers are not completely isolated and the change mechanism of ground subsidence due to dewatering in the foundation pit, an open cut foundation pit for a subway...
Main Authors: | Lu Zhang, Xiaojun Zhou, Yingdong Pan, Bowen Zeng, Dongfeng Zhu, Huaizu Jiang |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/1046937 |
Similar Items
-
Investigation on Dewatering of a Deep Shaft in Strong Permeable Sandy Pebble Strata on the Bank of the Yellow River
by: Yuchao Zheng, et al.
Published: (2021-01-01) -
The application of land subsidence control technologies caused by deep foundation pit dewatering
by: J. Liu
Published: (2020-04-01) -
Establishment and practice of land subsidence control and management system for deep foundation pit dewatering in Shanghai
by: X. Huang, et al.
Published: (2020-04-01) -
Dewatering Characteristics and Inflow Prediction of Deep Foundation Pits with Partial Penetrating Curtains in Sand and Gravel Strata
by: Linghui Liu, et al.
Published: (2019-10-01) -
Comprehensive experimental study on prevention of land subsidence caused by dewatering in deep foundation pit with hanging waterproof curtain
by: T. L. Yang, et al.
Published: (2015-11-01)