Systemic integrated method for assessing factors affecting construction timelines
To streamline construction planning, one needs to assess and perform trial modeling of organizational and process-related factors impacting the final planned performance indicators. A proper calendar plan, one that would take due account of said factors, has a substantial impact on the efficiency an...
Main Authors: | Lapidus Azary, Abramov Ivan |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201819305033 |
Similar Items
-
Formation of production structural units within a construction company using the systemic integrated method when implementing high-rise development projects
by: Lapidus Azary, et al.
Published: (2018-01-01) -
Studying the methods for determining and maintaining sustainability of a construction firm
by: Lapidus Azariy, et al.
Published: (2018-01-01) -
Timeliner Integrated Development Environment
by: Dobuzhskaya, Maya
Published: (2009) -
Integrating Timeliner and autonomous planning
by: Swanton, Daniel Reed
Published: (2008) -
Development software for the non-destructive control of monolithic structures in housing construction
by: Lapidus Azary, et al.
Published: (2021-01-01)