Systemic integrated method for assessing factors affecting construction timelines

To streamline construction planning, one needs to assess and perform trial modeling of organizational and process-related factors impacting the final planned performance indicators. A proper calendar plan, one that would take due account of said factors, has a substantial impact on the efficiency an...

Full description

Bibliographic Details
Main Authors: Lapidus Azary, Abramov Ivan
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201819305033
id doaj-0ad630e1ba294e6eacedba199fd76276
record_format Article
spelling doaj-0ad630e1ba294e6eacedba199fd762762021-03-02T09:18:58ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-011930503310.1051/matecconf/201819305033matecconf_esci2018_05033Systemic integrated method for assessing factors affecting construction timelinesLapidus AzaryAbramov IvanTo streamline construction planning, one needs to assess and perform trial modeling of organizational and process-related factors impacting the final planned performance indicators. A proper calendar plan, one that would take due account of said factors, has a substantial impact on the efficiency and, sometimes, even the feasibility of a construction project as a whole. Therefore, the purpose of this paper’s research is to develop a method for determining optimum technical and economic parameters. A method should be considered legitimate which, given the labour intensity of the jobs assigned to a crew and the list of such jobs, makes it possible to determine the time said jobs will take to perform depending on the variation of the following factors: crew/unit numbers, job synchronization degree, job performance sequence, number of shifts and unit productivity. The authors have studied the algorithm and the method for the trial modeling of organizational and process-related factors when developing a calendar plan in order to identify qualitative time-specific and feasibility parameters. The paper reviews the example of how the optimum performance timelines for each crew can be determined.https://doi.org/10.1051/matecconf/201819305033
collection DOAJ
language English
format Article
sources DOAJ
author Lapidus Azary
Abramov Ivan
spellingShingle Lapidus Azary
Abramov Ivan
Systemic integrated method for assessing factors affecting construction timelines
MATEC Web of Conferences
author_facet Lapidus Azary
Abramov Ivan
author_sort Lapidus Azary
title Systemic integrated method for assessing factors affecting construction timelines
title_short Systemic integrated method for assessing factors affecting construction timelines
title_full Systemic integrated method for assessing factors affecting construction timelines
title_fullStr Systemic integrated method for assessing factors affecting construction timelines
title_full_unstemmed Systemic integrated method for assessing factors affecting construction timelines
title_sort systemic integrated method for assessing factors affecting construction timelines
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2018-01-01
description To streamline construction planning, one needs to assess and perform trial modeling of organizational and process-related factors impacting the final planned performance indicators. A proper calendar plan, one that would take due account of said factors, has a substantial impact on the efficiency and, sometimes, even the feasibility of a construction project as a whole. Therefore, the purpose of this paper’s research is to develop a method for determining optimum technical and economic parameters. A method should be considered legitimate which, given the labour intensity of the jobs assigned to a crew and the list of such jobs, makes it possible to determine the time said jobs will take to perform depending on the variation of the following factors: crew/unit numbers, job synchronization degree, job performance sequence, number of shifts and unit productivity. The authors have studied the algorithm and the method for the trial modeling of organizational and process-related factors when developing a calendar plan in order to identify qualitative time-specific and feasibility parameters. The paper reviews the example of how the optimum performance timelines for each crew can be determined.
url https://doi.org/10.1051/matecconf/201819305033
work_keys_str_mv AT lapidusazary systemicintegratedmethodforassessingfactorsaffectingconstructiontimelines
AT abramovivan systemicintegratedmethodforassessingfactorsaffectingconstructiontimelines
_version_ 1724239573989457920