A two-stage stochastic rule-based model to determine pre-assembly buffer content

Abstract This study considers instant decision-making needs of the automobile manufactures for resequencing vehicles before final assembly (FA). We propose a rule-based two-stage stochastic model to determine the number of spare vehicles that should be kept in the pre-assembly buffer to restore the...

Full description

Bibliographic Details
Main Authors: Elif Elcin Gunay, Ufuk Kula
Format: Article
Language:English
Published: Islamic Azad University 2018-01-01
Series:Journal of Industrial Engineering International
Subjects:
Online Access:http://link.springer.com/article/10.1007/s40092-017-0252-4

Similar Items