Bottom paving as a part of the low pressure culvert erected by the float-on method
The widely used low pressure culverts are operated in the drop range between 1.5 and 5.0 meters. They distinguish by the near critical pairing mode of bays: in the downstream the true hydraulic jump does not develop. In this case the undular hydraulic jump develops in the downstream. Article is devo...
Main Authors: | T.V. Ivanova, A.E. Andreyev |
---|---|
Format: | Article |
Language: | English |
Published: |
Peter the Great St. Petersburg Polytechnic University
2012-12-01
|
Series: | Инженерно-строительный журнал |
Subjects: | |
Online Access: | http://engstroy.spb.ru/index_2012_09/ivanova.pdf |
Similar Items
-
Paving Geopolimer Berbahan Dasar Bottom Ash dan Sugar Cane Bagasse Ash (SCBA)
by: Achmad Freddya Eka Prasandha, et al.
Published: (2015-12-01) -
Guiding Paving Block Porous for Blind People
by: Isradi Muhammad, et al.
Published: (2020-04-01) -
Penggunaan Limbah Hasil Pembakaran Batu Bara dan Sugar Cane Bagasse Ash (SCBA) pada Paving Geopolimer dengan Proses Steam Curing
by: Dimas Setiyo Nugroho, et al.
Published: (2015-12-01) -
Bottom-up Emission Inventory and Its Spatio-Temporal Distribution from Paved Road Dust Based on Field Investigation: A Case Study of Harbin, Northeast China
by: Lili Li, et al.
Published: (2021-03-01) -
APPLYING RISK MANAGEMENT IN A PAVING PROJECT
by: Isis Mazur, et al.
Published: (2018-12-01)