The Air Traffic Controller Work-Shift Scheduling Problem in Spain from a Multiobjective Perspective: A Metaheuristic and Regular Expression-Based Approach
We address an air traffic control operator (ATCo) work-shift scheduling problem. We consider a multiple objective perspective where the number of ATCos is fixed in advance and a set of ATCo labor conditions have to be satisfied. The objectives deal with the ATCo work and rest periods and positions,...
Main Authors: | Faustino Tello, Alfonso Mateos, Antonio Jiménez-Martín, Adán Suárez |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2018-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2018/4719178 |
Similar Items
-
A Multiobjective Metaheuristic for Job-Shop Scheduling
by: C. Grosan
Published: (2009-07-01) -
A Variation of the ATC Work Shift Scheduling Problem to Deal with Incidents at Airport Control Centers
by: Antonio Jiménez-Martín, et al.
Published: (2020-03-01) -
A Comparative Analysis of Simulated Annealing and Variable Neighborhood Search in the ATCo Work-Shift Scheduling Problem
by: Faustino Tello, et al.
Published: (2019-07-01) -
Fatigue Minimization Work Shift Scheduling for Air Traffic Controllers
by: Ta-Chung Wang, et al.
Published: (2013-05-01) -
Metaheuristic and multiobjective approaches for space allocation
by: Landa Silva, Jesus Dario
Published: (2003)