Optimization of joint recycling process of drilling sludge and phosphogypsum
Joint recycling of drilling sludge and phosphogypsum with obtaining a building material is environmentally appropriate and cost-effective, as it helps not only to prevent environmental pollution, but also to solve the problem of rational nature management. Drilling sludge is a waste formed during dr...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Sumy State University
2016-06-01
|
Series: | Журнал інженерних наук |
Subjects: | |
Online Access: | http://jes.sumdu.edu.ua/wp-content/uploads/2016/08/JES_2016_01_G_01_V3.pdf |
id |
doaj-08f7d9dca80741a198a526fd5bf3bfbf |
---|---|
record_format |
Article |
spelling |
doaj-08f7d9dca80741a198a526fd5bf3bfbf2020-11-25T00:09:02ZengSumy State UniversityЖурнал інженерних наук2312-24982414-93812016-06-0131G1G5Optimization of joint recycling process of drilling sludge and phosphogypsumI. Yu. Ablieieva0Sumy State UniversityJoint recycling of drilling sludge and phosphogypsum with obtaining a building material is environmentally appropriate and cost-effective, as it helps not only to prevent environmental pollution, but also to solve the problem of rational nature management. Drilling sludge is a waste formed during drilling oil wells, and phosphogypsum is a waste of the chemical industry, formed as a result of the production of concentrational phosphoric acid. However, technogenic raw materials contain heavy metals that can be transformed into a finished product and leached out of it. The problem of minimizing the negative impact of pollutants is very important to reduce the risk to human health. The author's idea is to optimize ecological characteristics of drilling waste and phosphogypsum recycling process. The concentration of heavy metals in the extract of gypsum concrete was determined as the function of the target which depends primarily on structural and technological parameters. The purpose of the article is solution to mathematical programming task, i.e., finding optimal solutions for the factors values of drilling sludge and phosphogypsum recycling process. Mathematical programming solution to optimization problem of the gypsum concrete environmental characteristics (to minimize concentration of heavy metals in the extract) was performed by the method of simple random search in the Borland C ++ programming environment using C programming language. It is necessary to observe the values of such factors to minimize concentration of heavy metals in the extract of gypsum concrete. The mass ratio of gypsum binder and drilling sludge is 2.93 units, the mass ratio of quick lime and gypsum binder is 0.09 units, the age of gypsum concrete is above 19 days, exposure time is 28 days.http://jes.sumdu.edu.ua/wp-content/uploads/2016/08/JES_2016_01_G_01_V3.pdfrecycling of industrial wastessecondary raw materialsgypsum concretediffusion of heavy metalsmathematical programmingsimple random search method |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
I. Yu. Ablieieva |
spellingShingle |
I. Yu. Ablieieva Optimization of joint recycling process of drilling sludge and phosphogypsum Журнал інженерних наук recycling of industrial wastes secondary raw materials gypsum concrete diffusion of heavy metals mathematical programming simple random search method |
author_facet |
I. Yu. Ablieieva |
author_sort |
I. Yu. Ablieieva |
title |
Optimization of joint recycling process of drilling sludge and phosphogypsum |
title_short |
Optimization of joint recycling process of drilling sludge and phosphogypsum |
title_full |
Optimization of joint recycling process of drilling sludge and phosphogypsum |
title_fullStr |
Optimization of joint recycling process of drilling sludge and phosphogypsum |
title_full_unstemmed |
Optimization of joint recycling process of drilling sludge and phosphogypsum |
title_sort |
optimization of joint recycling process of drilling sludge and phosphogypsum |
publisher |
Sumy State University |
series |
Журнал інженерних наук |
issn |
2312-2498 2414-9381 |
publishDate |
2016-06-01 |
description |
Joint recycling of drilling sludge and phosphogypsum with obtaining a building material is environmentally appropriate and cost-effective, as it helps not only to prevent environmental pollution, but also to solve the problem of rational nature management. Drilling sludge is a waste formed during drilling oil wells, and phosphogypsum is a waste of the chemical industry, formed as a result of the production of concentrational phosphoric acid. However, technogenic raw materials contain heavy metals that can be transformed into a finished product and leached out of it. The problem of minimizing the negative impact of pollutants is very important to reduce the risk to human health. The author's idea is to optimize ecological characteristics of drilling waste and phosphogypsum recycling process. The concentration of heavy metals in the extract of gypsum concrete was determined as the function of the target which depends primarily on structural and technological parameters. The purpose of the article is solution to mathematical programming task, i.e., finding optimal solutions for the factors values of drilling sludge and phosphogypsum recycling process. Mathematical programming solution to optimization problem of the gypsum concrete environmental characteristics (to minimize concentration of heavy metals in the extract) was performed by the method of simple random search in the Borland C ++ programming environment using C programming language. It is necessary to observe the values of such factors to minimize concentration of heavy metals in the extract of gypsum concrete. The mass ratio of gypsum binder and drilling sludge is 2.93 units, the mass ratio of quick lime and gypsum binder is 0.09 units, the age of gypsum concrete is above 19 days, exposure time is 28 days. |
topic |
recycling of industrial wastes secondary raw materials gypsum concrete diffusion of heavy metals mathematical programming simple random search method |
url |
http://jes.sumdu.edu.ua/wp-content/uploads/2016/08/JES_2016_01_G_01_V3.pdf |
work_keys_str_mv |
AT iyuablieieva optimizationofjointrecyclingprocessofdrillingsludgeandphosphogypsum |
_version_ |
1725413278208753664 |