Preliminary Field Tests and Long-Term Monitoring as a Method of Design Risk Mitigation: A Case Study of Gdańsk Deepwater Container Terminal

Appropriate risk assessment plays a fundamental role in the design. . The authors propose a possible method of design risk mitigation, which follows recommendations included in Eurocode 7. The so-called “Observational Method” (OM) can produce savings in costs and programmes on engineering projects w...

Full description

Bibliographic Details
Main Authors: Miśkiewicz Mikołaj, Mitrosz Oskar, Brzozowski Tadeusz
Format: Article
Language:English
Published: Sciendo 2017-09-01
Series:Polish Maritime Research
Subjects:
Online Access:https://doi.org/10.1515/pomr-2017-0095