Preliminary Field Tests and Long-Term Monitoring as a Method of Design Risk Mitigation: A Case Study of Gdańsk Deepwater Container Terminal
Appropriate risk assessment plays a fundamental role in the design. . The authors propose a possible method of design risk mitigation, which follows recommendations included in Eurocode 7. The so-called “Observational Method” (OM) can produce savings in costs and programmes on engineering projects w...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2017-09-01
|
Series: | Polish Maritime Research |
Subjects: | |
Online Access: | https://doi.org/10.1515/pomr-2017-0095 |
id |
doaj-082420205ba146f4a1729123a60900de |
---|---|
record_format |
Article |
spelling |
doaj-082420205ba146f4a1729123a60900de2021-09-05T13:59:50ZengSciendoPolish Maritime Research2083-74292017-09-0124310611410.1515/pomr-2017-0095pomr-2017-0095Preliminary Field Tests and Long-Term Monitoring as a Method of Design Risk Mitigation: A Case Study of Gdańsk Deepwater Container TerminalMiśkiewicz Mikołaj0Mitrosz Oskar1Brzozowski Tadeusz2Gdansk University of Technology, Faculty of Civil and Environmental Engineering, PolandKeller Polska Sp. z o.o.Keller Polska Sp. z o.o.Appropriate risk assessment plays a fundamental role in the design. . The authors propose a possible method of design risk mitigation, which follows recommendations included in Eurocode 7. The so-called “Observational Method” (OM) can produce savings in costs and programmes on engineering projects without compromising safety. The case study presented is a complex design solution that deals with the heavy foundations of a gantry crane beam as one of the elements of a Deepwater Container Terminal extension. The paper presents a detailed process of the design of the rear crane beam being a part of the brand new berth, together with its static analysis, as well as the long-term results of observations, which have revealed the real performance of the marine structure. The case presented is based on excessive preliminary field tests and technical monitoring of the structure, and is an example of a successful OM implementation and design risk mitigation.https://doi.org/10.1515/pomr-2017-0095monitoringfield testobservational methodcfa pilesmicropilesgeotechnics |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Miśkiewicz Mikołaj Mitrosz Oskar Brzozowski Tadeusz |
spellingShingle |
Miśkiewicz Mikołaj Mitrosz Oskar Brzozowski Tadeusz Preliminary Field Tests and Long-Term Monitoring as a Method of Design Risk Mitigation: A Case Study of Gdańsk Deepwater Container Terminal Polish Maritime Research monitoring field test observational method cfa piles micropiles geotechnics |
author_facet |
Miśkiewicz Mikołaj Mitrosz Oskar Brzozowski Tadeusz |
author_sort |
Miśkiewicz Mikołaj |
title |
Preliminary Field Tests and Long-Term Monitoring as a Method of Design Risk Mitigation: A Case Study of Gdańsk Deepwater Container Terminal |
title_short |
Preliminary Field Tests and Long-Term Monitoring as a Method of Design Risk Mitigation: A Case Study of Gdańsk Deepwater Container Terminal |
title_full |
Preliminary Field Tests and Long-Term Monitoring as a Method of Design Risk Mitigation: A Case Study of Gdańsk Deepwater Container Terminal |
title_fullStr |
Preliminary Field Tests and Long-Term Monitoring as a Method of Design Risk Mitigation: A Case Study of Gdańsk Deepwater Container Terminal |
title_full_unstemmed |
Preliminary Field Tests and Long-Term Monitoring as a Method of Design Risk Mitigation: A Case Study of Gdańsk Deepwater Container Terminal |
title_sort |
preliminary field tests and long-term monitoring as a method of design risk mitigation: a case study of gdańsk deepwater container terminal |
publisher |
Sciendo |
series |
Polish Maritime Research |
issn |
2083-7429 |
publishDate |
2017-09-01 |
description |
Appropriate risk assessment plays a fundamental role in the design. . The authors propose a possible method of design risk mitigation, which follows recommendations included in Eurocode 7. The so-called “Observational Method” (OM) can produce savings in costs and programmes on engineering projects without compromising safety. The case study presented is a complex design solution that deals with the heavy foundations of a gantry crane beam as one of the elements of a Deepwater Container Terminal extension. The paper presents a detailed process of the design of the rear crane beam being a part of the brand new berth, together with its static analysis, as well as the long-term results of observations, which have revealed the real performance of the marine structure. The case presented is based on excessive preliminary field tests and technical monitoring of the structure, and is an example of a successful OM implementation and design risk mitigation. |
topic |
monitoring field test observational method cfa piles micropiles geotechnics |
url |
https://doi.org/10.1515/pomr-2017-0095 |
work_keys_str_mv |
AT miskiewiczmikołaj preliminaryfieldtestsandlongtermmonitoringasamethodofdesignriskmitigationacasestudyofgdanskdeepwatercontainerterminal AT mitroszoskar preliminaryfieldtestsandlongtermmonitoringasamethodofdesignriskmitigationacasestudyofgdanskdeepwatercontainerterminal AT brzozowskitadeusz preliminaryfieldtestsandlongtermmonitoringasamethodofdesignriskmitigationacasestudyofgdanskdeepwatercontainerterminal |
_version_ |
1717812915949535232 |