A methodology of risk assessment and management for a large industrial area

When investigating large industrial site with very limited site historical information and monitoring data, there will be many challenges to determine the remediation cost and strategy. Here the author illustrates a methodology of risk assessment management for large industrial area. Based on proper...

Full description

Bibliographic Details
Main Author: Peng Shiyuan
Format: Article
Language:English
Published: EDP Sciences 2021-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/48/e3sconf_icepg2021_02030.pdf
id doaj-08156e6cf36b42eea0ccd46d53f17a98
record_format Article
spelling doaj-08156e6cf36b42eea0ccd46d53f17a982021-06-18T08:20:35ZengEDP SciencesE3S Web of Conferences2267-12422021-01-012720203010.1051/e3sconf/202127202030e3sconf_icepg2021_02030A methodology of risk assessment and management for a large industrial areaPeng Shiyuan0Environmental Science and Engineering Department, Chongqing Jiaotong universityWhen investigating large industrial site with very limited site historical information and monitoring data, there will be many challenges to determine the remediation cost and strategy. Here the author illustrates a methodology of risk assessment management for large industrial area. Based on proper conceptual model and professional judgement, a score card for each single site can be generated, including the risk scores for the source, path and receptors. Eventually the score results of the sites can be presented on the overall map through different colour. It is an efficient and direct way which can help the decision maker to tell the priority of allocating the resource for site investigation. The ranking of the site’s score will also show an expected cost level of the sites, which could remind the developer to apply more economical strategy at early planning stage.https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/48/e3sconf_icepg2021_02030.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Peng Shiyuan
spellingShingle Peng Shiyuan
A methodology of risk assessment and management for a large industrial area
E3S Web of Conferences
author_facet Peng Shiyuan
author_sort Peng Shiyuan
title A methodology of risk assessment and management for a large industrial area
title_short A methodology of risk assessment and management for a large industrial area
title_full A methodology of risk assessment and management for a large industrial area
title_fullStr A methodology of risk assessment and management for a large industrial area
title_full_unstemmed A methodology of risk assessment and management for a large industrial area
title_sort methodology of risk assessment and management for a large industrial area
publisher EDP Sciences
series E3S Web of Conferences
issn 2267-1242
publishDate 2021-01-01
description When investigating large industrial site with very limited site historical information and monitoring data, there will be many challenges to determine the remediation cost and strategy. Here the author illustrates a methodology of risk assessment management for large industrial area. Based on proper conceptual model and professional judgement, a score card for each single site can be generated, including the risk scores for the source, path and receptors. Eventually the score results of the sites can be presented on the overall map through different colour. It is an efficient and direct way which can help the decision maker to tell the priority of allocating the resource for site investigation. The ranking of the site’s score will also show an expected cost level of the sites, which could remind the developer to apply more economical strategy at early planning stage.
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/48/e3sconf_icepg2021_02030.pdf
work_keys_str_mv AT pengshiyuan amethodologyofriskassessmentandmanagementforalargeindustrialarea
AT pengshiyuan methodologyofriskassessmentandmanagementforalargeindustrialarea
_version_ 1721373088370655232