Model Simultan Penentuan Toleransi Komponen Produk Rakitan dan Pabrik dalam Kolaborasi Manufaktur Make-to-Order
This paper discusses the development of simultaneous optimization model to determine component tolerance of assembly product and plant for manufacturing processes by considering quality tolerance limits, and delivery time constraint to minimize total cost in collaboration environment of make-to-orde...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Petra Christian University
2010-01-01
|
Series: | Jurnal Teknik Industri |
Subjects: | |
Online Access: | http://puslit2.petra.ac.id/ejournal/index.php/ind/article/view/18067 |
id |
doaj-07d3b7af2e2b4305acf248054f31d739 |
---|---|
record_format |
Article |
spelling |
doaj-07d3b7af2e2b4305acf248054f31d7392020-11-24T23:41:38ZengPetra Christian UniversityJurnal Teknik Industri1411-24852010-01-01122109118Model Simultan Penentuan Toleransi Komponen Produk Rakitan dan Pabrik dalam Kolaborasi Manufaktur Make-to-OrderM. Imron MustajibThis paper discusses the development of simultaneous optimization model to determine component tolerance of assembly product and plant for manufacturing processes by considering quality tolerance limits, and delivery time constraint to minimize total cost in collaboration environment of make-to-order manufacturing systems. Total cost of the system consists of manufacturing costs and quality loss costs as the tolerance function, operational costs for multi-plant manufacturing collaboration which includes: setup costs, material handling costs, operating costs of assembly, manual operations costs, and transportation costs. Formulation of the model developed uses mixed integer non linear programming as a method of solution search. In the numerical examples presented, the optimization process results an optimal solution. Optimal solution is not sensitive if the changes in quality tolerance constraint and delivery time constraint is not large. While the addition of an alternative plant for producing a component can changes the alternative plant selected http://puslit2.petra.ac.id/ejournal/index.php/ind/article/view/18067Optimization modelquality lossprocess capabilitydelivery timeMTO |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
M. Imron Mustajib |
spellingShingle |
M. Imron Mustajib Model Simultan Penentuan Toleransi Komponen Produk Rakitan dan Pabrik dalam Kolaborasi Manufaktur Make-to-Order Jurnal Teknik Industri Optimization model quality loss process capability delivery time MTO |
author_facet |
M. Imron Mustajib |
author_sort |
M. Imron Mustajib |
title |
Model Simultan Penentuan Toleransi Komponen Produk Rakitan dan Pabrik dalam Kolaborasi Manufaktur Make-to-Order |
title_short |
Model Simultan Penentuan Toleransi Komponen Produk Rakitan dan Pabrik dalam Kolaborasi Manufaktur Make-to-Order |
title_full |
Model Simultan Penentuan Toleransi Komponen Produk Rakitan dan Pabrik dalam Kolaborasi Manufaktur Make-to-Order |
title_fullStr |
Model Simultan Penentuan Toleransi Komponen Produk Rakitan dan Pabrik dalam Kolaborasi Manufaktur Make-to-Order |
title_full_unstemmed |
Model Simultan Penentuan Toleransi Komponen Produk Rakitan dan Pabrik dalam Kolaborasi Manufaktur Make-to-Order |
title_sort |
model simultan penentuan toleransi komponen produk rakitan dan pabrik dalam kolaborasi manufaktur make-to-order |
publisher |
Petra Christian University |
series |
Jurnal Teknik Industri |
issn |
1411-2485 |
publishDate |
2010-01-01 |
description |
This paper discusses the development of simultaneous optimization model to determine component tolerance of assembly product and plant for manufacturing processes by considering quality tolerance limits, and delivery time constraint to minimize total cost in collaboration environment of make-to-order manufacturing systems. Total cost of the system consists of manufacturing costs and quality loss costs as the tolerance function, operational costs for multi-plant manufacturing collaboration which includes: setup costs, material handling costs, operating costs of assembly, manual operations costs, and transportation costs. Formulation of the model developed uses mixed integer non linear programming as a method of solution search. In the numerical examples presented, the optimization process results an optimal solution. Optimal solution is not sensitive if the changes in quality tolerance constraint and delivery time constraint is not large. While the addition of an alternative plant for producing a component can changes the alternative plant selected |
topic |
Optimization model quality loss process capability delivery time MTO |
url |
http://puslit2.petra.ac.id/ejournal/index.php/ind/article/view/18067 |
work_keys_str_mv |
AT mimronmustajib modelsimultanpenentuantoleransikomponenprodukrakitandanpabrikdalamkolaborasimanufakturmaketoorder |
_version_ |
1725506259483885568 |