Integrated Scheduling of Tasks and Preventive Maintenance Periods in a Parallel Machine Environment With Single Robot Server
In this study, the objective of minimizing makespan has been considered for a scheduling problem of identical parallel machines with a single server and unavailability constraints. The unavailability constraints correspond to preventive maintenance periods. In this study, the jobs and the maintenanc...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2021-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/9433500/ |