Developing a lean measurement system to enhance process improvement
A key ingredient to underpin process improvement is a robust, reliable, repeatable measurement system. Process improvement activity needs to be supported by accurate and precise data because effective decision making, within process improvement activity, demands the use...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2013-01-01
|
Series: | International Journal of Metrology and Quality Engineering |
Subjects: | |
Online Access: | https://doi.org/10.1051/ijmqe/2013058 |
Summary: | A key ingredient to underpin process improvement is a robust, reliable, repeatable
measurement system. Process improvement activity needs to be supported by accurate and
precise data because effective decision making, within process improvement activity,
demands the use of “hard” data. One of the oldest and most established process improvement
methods is Deming’s Plan-Do-Check-Act (PDCA) cycle which is reliant on the check phase, a
measurement activity where data is being gathered and evaluated. Recent expansions of the
PDCA such as the Six-Sigma Define-Measure-Analyse-Improve-Control (DMAIC) methodology
place significant importance upon measurement. The DMAIC cycle incorporates the regimented
requirement for the inclusion of measurement system analysis (MSA) into the breakthrough
strategy. The call for MSA within the DMAIC cycle is to provide the improvement activity
with a robust measurement system that will ensure a pertinent level of data during any
validation process. The Lean methodology is heavily centred on the removal of the seven
Mudas (wastes) from a manufacturing process: defects, overproduction, transportation,
waiting, inventory, motion and processing. The application of lean, particularly within
the manufacturing industry, has led to a perception that measurement is a waste within a
manufacturing process because measurement processes identify defective products. The
metrologists’ pursuit for measurement excellence could be construed as a hindrance by the
“cost down” demands being perpetrated from the same organisation’s lean policy. So what
possible benefits does enforcing the regimes of the lean and quality philosophies upon the
measurement process have and how does this ultimately enhance the process improvement
activity? The key fundamental to embed with any process improvement is the removal of
waste. The process improvement techniques embedded within lean and quality concepts are
extremely powerful practices in the drive to eradicate waste but there are numerous
contextual problems with the application of the process improvement activity and its
associated measurement system. The application demands of the organisation may be
dependent on a number of financial and resource constraints which may introduce reasons
not to apply stringent measurement methodology and practice. The failure of various
process improvement activities due to poorly managed measurement activity has arguably
never been comprehensively analysed. Process improvement activity theory fully embellishes
the need for applied robust measurement systems, so how can process improvement and
measurement be systematically aligned to gain benefits? The aim of this paper is to
consider whether lean philosophies can be integrated and applied within measurement
systems. The discussion seeks to identify if seven Muda exist within measurement systems
and whether in doing so this will lead to benefits for process improvement activities. |
---|---|
ISSN: | 2107-6839 2107-6847 |